Comparison
Cut-to-length servo feed: which control architecture fits
Short answer
Use the PLC's built-in pulse output as a relative move: each cycle the program multiplies the typed length by the motor revolutions per millimetre of travel and the drive's command pulses per revolution, sends that count to the drive, and releases the cutter on motion-complete. Stored-position drives fit fixed move sets, and a position-control card only pays off past the CPU's built-in axis count.

On this page
For a fabric feeder whose cut length is typed at the operator screen every cycle, run the axis on the PLC's built-in pulse output as a relative move. Each cycle the program converts the typed length into a command pulse count, the drive executes the move, and the cutter is released on motion-complete. A standalone drive with a stored position table suits a fixed list of moves, and a position-control card only pays for itself once the axis count outgrows the CPU's built-in channels. Below: the four architectures compared, the distance-to-pulse arithmetic, and a worked sizing for a single-axis feeder.
Four ways to command the feed #
| Architecture | Best fit | What it costs | Decision for this machine |
|---|---|---|---|
| PLC built-in pulse output, relative move | One or two axes, distance computed every cycle in the program | Pulse frequency capped by the CPU's channel rating | Use it for the six new single-axis feeders |
| PLC plus a position-control card | Axis counts beyond the built-in channels, buffered multi-step profiles | Extra hardware and its own configuration layer | Leave it on the legacy machine; not needed for one axis |
| Standalone drive or indexer with stored positions | A fixed set of preprogrammed moves selected by digital outputs | Every new length means re-teaching the drive | Reject for a length typed every cycle |
| Fieldbus motion (CSP) | Many axes under one network motion controller | Servos with the network interface, more engineering | Overkill for one axis; the step when several machines merge into one cell |
The machine already running proves the sequence: an older rack PLC with a dedicated position card steps a motor, the fabric advances, the blade comes down. The new units change one thing — the distance arrives as an operator entry that differs every cycle — and that one change picks the architecture.
Why a typed length rules out stored positions #
A stored-position controller holds a table of targets; the PLC raises a few digital outputs to select one and the drive runs there. That is a clean, proven design when the move list is fixed. A cut length typed at the screen is a target that does not exist until the operator enters it, so the table model forces a re-teach of the drive for every new length — a configuration-software job, not an operator job. The entry already lands in a PLC data-memory word, so do the scaling there and command pulses.
Turning millimetres into command pulses #
The rule in words: the command pulse count equals the feed distance times the motor revolutions per millimetre of travel times the drive's command pulses per motor revolution. The dimensions collapse to pulses, which is the check that the formula is assembled correctly.
- Travel per motor revolution comes from the mechanics: π times the roller's effective diameter — over the wrapped fabric, because the wrap adds to the bare roller — divided by the gearbox's motor revolutions per roller revolution. A belt stage multiplies in the same way.
- Command pulses per motor revolution come from the drive's command scaling or electronic gear parameters; take the number from that drive's parameter documentation, not from habit.
- The count must be a whole number, so write down the rounding rule, and confirm that the longest permitted length still fits the pulse instruction's operand width.
- The sign, or the separate direction output, sets feed against retract; verify positive at low speed with the cutter inhibited.
- At cycle start the program latches the accepted entry, checks it against the allowed range — the PLC check is the one that counts, since a communications fault can write anything — scales it, and hands the count to the pulse instruction. Block new cycles unless the drive is enabled and fault-free.
Before the first move, the axis also needs its own configuration pass — scaling, direction and limits — which is the subject of configuring a PLC pulse-output servo axis before the first move.
Worked example: sizing a 1,000 mm feed on a 50 mm roller #
Inputs, with where each comes from:
- Feed length: 1,000 mm — the operator's entry, a typical order length.
- Roller effective diameter: 50.0 mm — from the feed-roller drawing, measured over the wrapped fabric (example value).
- Gearbox ratio: 2 motor revolutions per roller revolution — the transmission drawing (example value).
- Command scaling: 10,000 command pulses per motor revolution — an example drive setting, read from its electronic gear parameters.
- Feed time: 2.0 s for the full length — the machine's cycle spec (example value).
- Cut tolerance: ±1 mm — the drawing's callout (example value).
Rule: command pulses = feed distance × motor revolutions per millimetre × command pulses per revolution, with travel per motor revolution = π × effective roller diameter ÷ motor revolutions per roller revolution. Every figure below is a calculated example for these inputs, not a measured result.
- Travel per motor revolution = 3.1416 × 50.0 mm ÷ 2 = 78.54 mm.
- Motor revolutions for the feed = 1,000 mm ÷ 78.54 mm = 12.7324 rev.
- Command pulses = 12.7324 rev × 10,000 pulses per revolution = 127,324 pulses, rounded to the whole pulse.
- Resolution: one pulse advances the fabric 78.54 mm ÷ 10,000 = 0.0079 mm, about 127 times finer than the ±1 mm tolerance — the scaling stays as chosen.
- Speed: 1,000 mm in 2.0 s is 500 mm per second; the motor turns 500 ÷ 78.54 = 6.37 revolutions per second, about 382 rpm, so the channel must sustain roughly 63,700 pulses per second, or 63.7 kHz.
- Operand width: 127,324 pulses is past the 65,535 ceiling of a 16-bit operand — that form would clip the feed near 515 mm — so the move goes out in the 32-bit instruction form; the 5,000 mm maximum order comes to 636,620 pulses, far inside a 32-bit signed count.
Result: for these inputs the feed commands as 127,324 pulses at up to 63.7 kHz. Keep the chosen scaling if the CPU's pulse channel is rated 100 kHz or more — a common rating in this CPU class, which you confirm in its datasheet — because the move then uses about two-thirds of the channel. If the datasheet rates the channel lower, halve the command scaling: the frequency halves with it and the resolution still lands far inside the tolerance. Issue the move in the 32-bit form and release the cutter only on the motion-complete bit.
What the motor-side encoder cannot see #
Whether the axis is the open-loop stepper of the existing machine or a servo with a motor-mounted encoder, the position being counted is the motor's. Roller slip on the fabric, stretch under tension and a wrong effective roller diameter all shift the cut while the drive reports a perfect move. Build the drive train so those errors have nowhere to hide: specify the gearbox or belt stage, the roller surface and the flexible shaft coupling between servo and roller as one system. If cut length still drifts, add a measuring-wheel encoder riding on the fabric and close the length on material travel — the counting side of that fix is covered in counting encoder pulses on a PLC without losing position.
Commissioning the six new feeders #
- Prove the screen transfer: enter known lengths and watch the destination data word; the displayed unit and the stored number must agree before any motion is enabled.
- Prove the validation: zero, negative and over-range entries must produce no pulse command and no cutter cycle.
- Check direction at low speed with the cutter inhibited; positive feed must advance the fabric.
- Test the drive-enable permissive and the drive-fault path; block every new cycle unless both are healthy.
- Run minimum, nominal and maximum lengths, measure the cut pieces, and trim the travel figure if a constant offset appears.
- Record the basis in the program header: entry unit, travel per motor revolution, command scaling, allowed length range, rounding rule.
- The cutter is the machine's hazard: guard it and interlock it to the level the machine's risk assessment calls for under ISO 13849-1 (ANSI B11 practice on US machines); the motion-complete bit is a sequence signal, not a safety function.
Questions asked
Can a stored-position drive still work if the length changes every cycle?
Only when the drive accepts a target position written over its serial or fieldbus link. The PLC then writes the new position into the drive each cycle and raises the start input. It works, but the scaling then lives in two places, and a communications fault can leave a stale position in the drive, so for a single axis the pulse-output route stays simpler to prove.
Does a stepper drive need different scaling than a servo drive?
No. Both take the same pulse-and-direction command, so the same three factors produce the count. The difference is feedback: the servo closes position on its motor encoder and can flag a following error, while the stepper relies on never losing steps, which makes torque margin and acceleration limits the things to verify on the stepper side.
How do I correct the cut length after commissioning?
Cut and measure a sample at a mid-range length, then multiply the travel figure in the scaling by the measured length divided by the commanded length. A constant error usually traces to the effective roller diameter, since the fabric wrap adds to the bare roller. Re-check minimum and maximum lengths after the trim, because a ratio error grows with length.
What happens if the operator edits the length during a move?
The running move is unaffected: the program latches the accepted entry when the cycle starts, so the edit applies from the next cycle. Without that latch, a mid-move change could scale a length the cutter sequence never saw, and the feed and the cut would drift apart.
Does a relative feed need a home sensor?
Not for the cut itself, because each move is measured from wherever the axis stopped. You still want a home or reference switch: after a power cycle, a fault or a manual jog the program has no trustworthy position, and homing restores a known start point before automatic cycles resume. Wire it as the reference input the motion instruction uses for its search.