Belts, pulleys, couplings and power transmission
Timing belts, pulleys, chains, couplings, shaft collars and keys: selecting, aligning and tensioning.
Latest articles
How-to
Sizing Timing Belt Preload for a High-Torque Servo Joint
Preload each belt side to at least half the peak tangential force F = T/r at the servo pulley — 462 N per side for 5.88 N·m on a 20-tooth GT2 pulley — and never above the lower of the belt's rated tension and half the output bearing's radial rating. At that torque, narrow GT2 stock falls below the minimum, so the belt stage needs less torque or a higher-rated belt. Verify with T = 4·m·L²·f².
How-to
Coupling a 22 mm Servo Shaft to a 14 mm Actuator Input
Yes — drive the 14 mm input through a stepped clamp-style jaw coupling on a keyed 14 mm stub, but keep the flange's centering function with an adapter plate whose two pilot registers are machined coaxial in one setup. Size the coupling on peak reversing torque, and indicate both hubs rotating together to about a tenth of the coupling's rated misalignment, not the rating itself.