Short answer

Measure force versus position through the seal before choosing hardware, then size from F_required = F_resistance + m_total × a. With 500 N and an 80 kg workpiece the workpiece-only acceleration ceiling is 6.25 m/s². Order an axis rated at least twice the measured requirement — 1000 N against that process force — and let the thrust-speed envelope, the screw-speed limit over the stroke, and the duty cycle pick belt, ball screw or worm drive.

On this page
  1. What to measure before choosing hardware
  2. The force and acceleration budget
  3. Thrust margin and duty cycle
  4. Belt, ball screw or worm drive for a long stroke
  5. Sizing the axis for an 80 kg push
  6. Guidance, side load and seal entry
  7. Holding speed through the O-ring
  8. Questions asked

Treat the 500 N as a budget to split between seal resistance and acceleration, not as a motor size. Measure force versus position across the bedding and through the O-ring with the real workpiece first, then size the drive from F_required = F_resistance + m_total × a: at 500 N and an 80 kg workpiece, the workpiece-only acceleration ceiling is 6.25 m/s². Because this push presses through a seal, apply the pressing-class margin of 2–3×, which puts the rating floor at 1000 N. Belt, ball screw or worm-driven screw then follows from the thrust-speed envelope, the screw-speed limit across 2 m of stroke, and the duty cycle — not from stroke length or a catalog force label.

What to measure before choosing hardware #

The force figure in the request is a capacity wish. The number that sizes the drive is the measured trace: breakaway force at the start, sliding force on the stainless bedding, and the seal-entry peak, each recorded against position with the actual workpiece finish, alignment, seal condition and the lubrication the process permits. Move slowly and log continuously; a single peak reading hides where along the stroke the load actually sits.

Define the motion at the same time: travel speed, acceleration and deceleration, dwell, cycles per period, and the speed deviation you can tolerate while the workpiece is in the seal. Get the process owner to accept those numbers before any motor is chosen; stroke length alone does not define the duty.

Define what the closed rod housing must deliver — an enclosed transmission, a telescoping push rod, contamination protection, or all three — because that constraint eliminates architectures before any torque is calculated.

If the measured peak reaches the requested force, stop sizing. Improve the seal entry, the alignment or the lubrication, or raise the force requirement; no drive choice fixes a process problem it still has to push through.

The force and acceleration budget #

Required thrust is F_required = F_resistance + m_total × a, where m_total is everything that accelerates — workpiece, carriage, tooling, push plate — not the 80 kg alone. The push is horizontal, so weight does not act along the axis, but it sets the bedding friction the trace already includes.

With the entire budget available for acceleration and only the workpiece moving, a = F/m works out to 6.25 m/s². That is a ceiling, not a design value: it assumes zero resistance and no carriage mass. The working rule is the sensitivity — each 100 N of measured resistance removes 1.25 m/s² of acceleration budget, and adding the carriage mass divides what remains again.

Mechanical output power is P = F × v with v in metres per second. The motor follows from torque through the transmission and from the duty it must survive, not from that watt number alone.

Thrust margin and duty cycle #

Selection guides for industrial linear actuators commonly multiply the calculated thrust requirement by 1.5–2× for standard cycling and 2–3× for pressing, impact or high-duty operation. Treat those factors as a rule of thumb and confirm the exact value in the sizing data for the actuator family you buy. Pushing through an O-ring is pressing, so the floor for this application is 2×.

Duty cycle is moving time divided by total cycle time, expressed as a percentage — a push of one time unit with two units of stopped time is 33% — and it is a thermal limit, not a motion one. A force rating quoted at light duty does not survive a machine that cycles continuously, so read the duty condition attached to every rating and use the manufacturer's derating curve for the frame you select.

Belt, ball screw or worm drive for a long stroke #

Architecture Why it suits a long-stroke push at moderate force What decides it
Belt-driven axis with a servo Long travel with no long rotating screw; linear speed set by pulley size and motor rpm; straightforward enclosure of the belt run Belt tensile rating and stiffness at length, tension, pulley and bearing loads, carriage guidance, and how far the seal peak deflects the axis
Ball-screw electric cylinder The screw lead gives mechanical advantage and the load is held at rest with little motor current Thrust-speed envelope, screw critical speed over the stroke, buckling of the extended rod, efficiency and heating at duty
Threaded rod with worm gearing Large reduction multiplies thrust and can hold the load unpowered Worm efficiency and heating, backlash, permissible screw rpm, and the travel speed actually reachable

A belt axis holds speed through a varying load when the servo behind it has torque reserve; the ratio choice on that side is the work covered in sizing servo reduction for belt-driven plasma table axes. Its weakness at this duty is compliance: belt stretch lets the motor advance while the workpiece momentarily slows, so the seal peak reaches the motor as a disturbance the loop must absorb. If the belt route wins, the specification work is matching pulleys and a timing belt to the thrust, tension and speed the trace demands.

A screw buys thrust with speed. For an ideal screw, torque is T = F × L/(2π) with lead L in metres per revolution; for an ideal belt pulley, T = F × r with pitch radius r in metres. Real efficiency, gearing and rotational inertia move both estimates, and the motor-side sizing for the screw case is the same task as choosing servo gearing for a ballscrew axis.

At this stroke the rotating screw is long, and critical speed becomes a hard ceiling: one ball-screw manufacturer's published guidance (Steinmeyer) is to run no faster than about 80% of the screw's critical speed, with the critical value taken from the maker's data for the chosen diameter, length and end fixity. For an extending push rod, check buckling at full extension separately — an enclosure tube is not lateral support.

Sizing the axis for an 80 kg push #

Inputs, each with its source:

  • Stroke 2 m, workpiece mass 80 kg, requested process force 500 N — the application's own numbers.
  • Margin class: pressing through a seal, so 2–3× per the selection-guide rule above.
  • Critical-speed ceiling: about 80% of critical for any screw, per the manufacturer guidance above.
  • Travel speed: the application sets none yet, so 0.5 m/s is an illustrative value — replace it with your specified speed. The 25 mm pulley radius and 10 mm screw lead below are round illustrative geometries; substitute your own.

Rule in words: required thrust equals measured resistance plus moving mass times acceleration; rated thrust equals required thrust times the margin; acceleration budget equals available thrust minus resistance, divided by moving mass.

Arithmetic, with F = 500 N, m = 80 kg and v = 0.5 m/s as the illustrative speed:

  1. Acceleration ceiling: a = F ÷ m = 6.25 m/s², assuming zero resistance and no carriage — the unreachable best case.
  2. Sensitivity: each 100 N of trace costs 100 ÷ 80 = 1.25 m/s². An illustrative 250 N seal-entry peak would leave (F − 250) ÷ 80 = 3.1 m/s².
  3. Rating: 2 × F = 1000 N minimum; 3 × F = 1500 N for a hot cycle.
  4. Mechanical power at the illustrative speed: P = F × v = 250 W.
  5. Ideal transmission torque at the same force: belt pulley T = F × 0.025 = 12.5 N·m at 0.5 ÷ (2π × 0.025) = 3.2 rev/s ≈ 190 rpm; screw T = F × 0.010 ÷ 2π = 0.80 N·m at 0.5 ÷ 0.010 = 50 rev/s = 3000 rpm. Both deliver 250 W — the screw needs about one-sixteenth of the torque but nearly sixteen times the rotational speed.

Decision: order an axis rated at least 1000 N at the speed you will actually run through the seal. Command acceleration no higher than the budget your trace leaves; with the full budget and nothing measured, 6.25 m/s² is the ceiling, and any real trace lands well under it. Between drives, 3000 rpm on a screw of this length is exactly where the 80%-of-critical rule bites: if the manufacturer's critical-speed line for your diameter and end fixity sits below 3000 rpm, take the belt route (about 190 rpm at the same linear speed) or a coarser lead — remembering a coarser lead moves torque back toward the belt's number.

Guidance, side load and seal entry #

The bedding carries the 80 kg and defines the path; the actuator supplies axial motion only. A push connection that also steers the workpiece converts the seal-entry peak into binding and loads the rod bearing even with axial force inside the rating. Guard the full travel and treat the moving workpiece as a pinch hazard, with the guarding and any interlocks set by the machine's risk assessment.

Before adjusting any servo gain, watch the workpiece through the whole stroke: if resistance climbs before the O-ring is reached, correct rubbing, skew or guide interference and re-record the force trace. At the seal, check concentricity, entry geometry and seal condition, and lubricate only with what the seal and the process allow. If the force spike changes strongly from pass to pass, that variation is alignment or contact condition — find it before attributing it to tuning.

Holding speed through the O-ring #

State the permitted speed deviation as a number before touching gains — a percentage of commanded speed through the seal zone — because a loop cannot be tuned against an unstated tolerance. Then read what the axis actually does:

  • Speed falls while torque or current sits at its limit: available thrust is insufficient or the load is heavier than the trace suggested. Compare the measured peak against the drive's torque-speed capability through the transmission.
  • Motor speed holds while workpiece speed drops: compliance, slip or backlash between motor and load. Measure the workpiece motion independently and inspect the mechanical connection.
  • Speed oscillates with torque headroom remaining: tuning, resonance or intermittent binding. Separate friction behavior from loop response before raising gains.

Stable speed through the disturbance is torque reserve plus a transmission stiff enough that the permitted deviation survives the seal peak. The servo raises torque only after feedback shows the axis falling behind, so it cannot manufacture thrust the mechanics do not have.

Questions asked

Why can't I size the actuator from the 500 N figure alone?

Because 500 N is a requested capacity, not a measured resistance. The axis must also accelerate the moving mass: at 80 kg, each 100 N spent overcoming resistance removes 1.25 m/s² of acceleration budget, and the absolute ceiling with the full force budget is 6.25 m/s². If the measured seal-entry peak approaches the requested figure there is nothing left to accelerate or to hold speed with, so raise the rating or reduce the resistance before ordering.

Does a ball screw always need a smaller motor than a belt?

No. An ideal screw needs torque F × L/(2π) against the belt pulley's F × r, so at a 10 mm lead and a 25 mm pitch radius the screw needs roughly a sixteenth of the torque at the same force. But it must then turn nearly sixteen times faster, and at 2 m of stroke the critical-speed limit can forbid that rpm, which hands the advantage back. The lead, not the architecture, sets the trade.

How do I keep the speed constant through the O-ring?

Speed stability comes from torque reserve and transmission stiffness, not from gain alone. First confirm the drive is not sitting at its torque or current limit at seal entry; then measure the workpiece speed independently of the motor to separate compliance and slip from control error; and fix pass-to-pass friction variation from alignment before retuning. The loop raises torque only after it sees the axis falling behind, so it cannot create thrust the mechanics lack.

Can the actuator rod support and guide the workpiece?

No. The bedding or an external guide carries the 80 kg and sets the path; the actuator supplies axial motion only. A push connection that steers the workpiece converts the seal-entry peak into binding and loads the rod bearing even when axial force is within the rating, so align the coupling, keep side load off the rod, and re-record the force trace after any guide change.

What thrust rating should I actually order?

Multiply the measured requirement by a margin: standard selection practice is 1.5–2× for ordinary cycling and 2–3× for pressing, impact or high duty. Pushing through an O-ring is pressing, so 2× is the floor — the process force here means ordering at least 1000 N at the speed you run through the seal, and 1500 N if the cycle runs hot. Take the exact derating from the maker's data.

Keep reading

  • How-to

    How to Choose Servo Gearing for a Ballscrew Router Axis

    Run 3:1 to 4:1 belt reduction on the X and Y axes and 2:1 on Z. The ratio comes from required rapid speed and the continuous torque rating, not the 190 oz-in stall figure; above about 4:1 a single timing-belt stage needs pulleys that do not fit a router.

    Motors, gearboxes and drives sizing

  • Selection guide

    Telescopic Slide Robot Arm Selection: Torque and Deflection

    Size a telescopic forearm on loaded tip deflection and shoulder torque, not on travel. With g = 9.81 m/s², a 12 kg tool is 118 N of weight, and the worked example totals the static shoulder torque at 900 mm of extension — worked out below. Stage overlap, not rail length, sets usable stroke.

    Linear motion, bearings and guides

  • Selection guide

    Choosing an Actuator to Compress a Small Spring Precisely

    A 2 lbf (8.90 N) spring over 0.5–0.75 in of travel at 0.025 in steps is a screw problem, not a motor problem: a manual fine-lead screw with a locknut holds the setting with no power. Add a stepper only for remote adjustment, an integrated actuator for automated sequences, or a pneumatic cylinder with an adjustable stop when only endpoint positions matter.

    Motors, gearboxes and drives sizing