Industrial robot arm comparison: reach, payload and repeatability
Short answer
No public database compares industrial robot arms on price against performance, so build the table yourself from each manufacturer manual: repeatability to ISO 9283, reach, payload read with the flange moment diagram, cycle time on your own move, and degrees of freedom. Quote every supplier against one written scope, drop the arms that miss the numbers, and rank what remains on installed cost.

On this page
- What to capture from each manual
- Repeatability: the ISO 9283 figure and its conditions
- Payload: read the moment diagram, not the headline
- Reach: the envelope decides, not the one number
- Speed: your cycle time against the speed specification
- Quote one scope and compare installed cost
- The decision for each application
- Questions asked
No public database compares industrial robot arms on price against performance, and the comparison that matters is one you build yourself. Each manufacturer publishes capability data per model under its own definitions and conditions and quotes prices case by case, so capture the same fields from each manual — repeatability to ISO 9283, reach, payload together with the flange moment diagram, cycle time on your own move, and degrees of freedom — then make every supplier quote one written scope. Arms that miss the numbers drop out first; the survivors are ranked on installed cost, never on the arm's list figure.
What to capture from each manual #
Two arms become comparable only when the same fields are copied with their test conditions; a number printed without its conditions is a label, not a specification. Record these fields for every candidate:
| Field | What to record | What it decides |
|---|---|---|
| Repeatability | Pose repeatability per ISO 9283, with the test load and speed | Whether the arm holds the process tolerance at your working poses |
| Accuracy | Pose accuracy per ISO 9283, where you program offline or reuse programs | Whether commanded positions land where the model says |
| Payload | Rated payload plus the load diagram of allowed mass against centre-of-gravity offset | Whether your gripper and part fit with margin |
| Wrist limits | Allowed moment and inertia at the flange | Whether fast reorientation moves stay inside the drives' capability |
| Reach | The definition used, wrist centre or flange face, plus the working-envelope drawing | Whether every target is reachable with the tool attached |
| Speed | Maximum TCP speed, and a simulated cycle time on your own move | Whether the cell makes rate |
| Axes | Degrees of freedom and wrist layout | Whether the tool takes every orientation the process needs |
| Scope | Controller, cables, pendant, software, flange, safety options included or excluded | The installed cost comparison |
Mark a field you cannot find as missing instead of estimating it, and get it from the supplier before the shortlist closes. An arm that misses a hard number — the tolerance, the moment, the envelope — is out before cost enters the room.
Repeatability: the ISO 9283 figure and its conditions #
Repeatability is the scatter of the stopping points when the arm returns to the same pose; accuracy is where those stops lie relative to a commanded coordinate, and ISO 9283 defines both. For pose repeatability the standard has the arm cycle five test poses, approaching each thirty times, and the published figure is the mean distance of the stops from their centre plus three standard deviations of those distances, so the number carries a statistical allowance rather than a best case.
Record the load and speed printed with the figure: the standard's conditions are the declared load, in practice the full rated payload, and the maximum speed attainable between the poses, so a repeatability quoted at a lighter load or reduced speed is a different number. Repeatability is also worst near the edge of the working volume, so the poses that count are yours, near your targets. For a taught-point cell, repeatability alone decides precision: keep it under about a third of the process position tolerance as a starting rule of thumb. For a cell programmed offline, or programs copied between machines, accuracy joins the comparison as a separate figure from the same standard.
Payload: read the moment diagram, not the headline #
The headline payload holds only for a tool whose centre of gravity sits on the flange axis within the offsets of the load diagram; a real gripper carries its mass forward, and the limit that actually binds is the moment at the wrist. That is why the datasheet pairs the payload with a diagram of allowed mass against centre-of-gravity distance from the flange, often with a second diagram for inertia. Adding a heavy gripper shifts that offset and adds its own joint to the chain, covered in mounting a heavy gripper on a robot wrist flange.
Worked example: gripper moment at the flange #
A calculated example for the inputs below, not a measured result; take the diagram point from the datasheet of the exact arm, not from this article.
- Inputs: gripper plus part 8 kg, combined centre of gravity 250 mm in front of the flange, and an example diagram point that allows 10 kg at that 250 mm offset.
- Static moment at the wrist: M = m x g x r = 8 kg x 9.81 m/s² x 0.25 m = 19.6 N·m.
- Allowed moment from the diagram: 10 kg x 9.81 m/s² x 0.25 m = 24.5 N·m.
- Margin: (24.5 N·m - 19.6 N·m) / 24.5 N·m = 0.20, so the tool sits 20% under the allowed moment.
- Point-mass inertia estimate for reorientation moves: I = m x r² = 8 kg x (0.25 m)² = 0.5 kg·m², to compare with the wrist inertia limit in the same datasheet.
Decision for these inputs: the tool passes the static check. Keep at least a 20% moment margin as a working rule of thumb, because a heavier variant part or longer fingers move the centre of gravity outward, and acceleration adds torque on top of the static moment — which is exactly what the inertia diagram governs.
Reach: the envelope decides, not the one number #
Manufacturers do not define reach identically — some measure to the wrist centre, some to the flange face with the arm stretched flat — so convert every candidate to one definition before the comparison means anything. A single reach number also hides the dead zone close to the base, the floor and ceiling cut-offs, and the orientation limits at full stretch, where repeatability and stiffness are at their weakest.
Method: fix the base position on the cell layout, measure the farthest target from the base axis plus the tool length behind the TCP, and require the reach, under the same definition, to exceed it. Then take the working-envelope drawing and check the nearest point and the machine-door geometry the same way. A working rule of thumb is to keep the farthest working point about 10% inside the published reach so the arm never runs at full stretch.
Speed: your cycle time against the speed specification #
Maximum TCP speed appears only on long straight moves that reach full acceleration; most cell moves are short and torque-limited, so the speed line says almost nothing about rate. Replace it with a number that does: define the representative cycle — same points, same payload, same blending and precision settings — and require each supplier to return a simulated cycle time on it, with the controller settings used. How that cycle breaks down is covered in what defines a robot pick and place cycle time of 5 seconds. The decision: compare the simulated cycle, never the datasheet's speed line.
Quote one scope and compare installed cost #
The arm's price is the smallest comparable slice of the cell. Send one written scope to every shortlisted supplier and require line-by-line confirmation of included, excluded and optional: controller, cables, teach pendant, software options such as motion packages and fieldbus drivers, flange and tooling interfaces, safety options, commissioning, training, and warranty length. A cheaper arm carrying a shorter scope is not a cheaper cell, and the scope table is the only place that shows it.
Where an arm already on the floor meets the mechanical numbers and only its control is obsolete, retrofitting 6 DOF robot arms with modern controllers is the comparison to make instead of a new purchase.
The decision for each application #
Degrees of freedom come from the process, not the brochure. Six axes give full command of tool position and orientation, which contour welding, adhesive paths and machine tending that must turn a part all require. Four or five axes — three for position plus wrist rotation — carry top-down picking and palletizing with a level wrist. A seventh axis buys elbow clearance for reaching around fixtures inside a tight cell, the trade covered in planning a 7-DOF robot arm with a rotary stage axis.
One safety note: collaborative operation is a validated cell property under ISO 10218 and ISO/TS 15066, set by the machine's risk assessment, and it runs at limited speed and payload — an arm's collaborative rating alone does not make a shared workspace compliant.
| Application | Numbers that decide it | Decision |
|---|---|---|
| Precision assembly on taught points | ISO 9283 repeatability at your poses, under about a third of the position tolerance (rule of thumb) | The smallest arm that holds tolerance and envelope; add accuracy only when programmed offline |
| Palletizing and heavy handling | Flange moment and inertia with roughly 20% margin; reach over the full pallet pattern | One payload class up rather than running at the diagram's edge |
| Machine tending | Six axes for reorientation; envelope checked inside the door opening | Compact wrist; verify reach inside the machine, not at the door |
| High-rate picking in a fenced cell | Simulated cycle time on your move with your payload | A standard arm behind the guard; collaborative features add cost without capability here |
| Workspace shared with people | Speed-and-separation or power-and-force limits set by the risk assessment | A collaborative arm to ISO/TS 15066, accepting the lower speed |
The order never changes: remove candidates on repeatability, moment and envelope; rank the survivors on the simulated cycle; buy the lowest installed cost against one written scope.
Questions asked
Is there a public database that compares industrial robot arms?
Not a complete one. Manufacturer sites list specifications per model, each defined by that manufacturer, and prices are quoted per project. Offline-programming tool libraries carry geometric models and basic specifications for many arms, which makes them good for shortlisting, but they rarely include test conditions or current prices. Use them to build a candidate list, then confirm every field in the manufacturer manual and get the cost from a quotation.
What is the difference between repeatability and accuracy?
Repeatability is how tightly the arm returns to its own stopping points; accuracy is how close those points lie to a commanded coordinate. Accuracy is typically several times worse and drifts with temperature, load and wear, which is why it matters for cells programmed offline or for programs copied between machines. If that is your case, ask for the ISO 9283 accuracy figure and budget for a calibration pass after installation, for example laser tracking.
Can I carry a heavier tool if I slow the arm down?
No. The payload and moment limits are static limits of the wrist gearbox, bearings and brake, and slower motion trims only the dynamic component on top of them. A power-loss stop still loads the wrist with the full static moment, and the holding brake is sized for the rated load. Running past the diagram shortens wrist life and can let the arm sag when power is removed.
Can I compare repeatability figures measured under different loads?
Only after normalising them. Repeatability depends on payload, speed and pose, so a figure quoted at half load does not represent your tool. Ask the supplier for the ISO 9283 figure at your payload, or test during a demo: command a working pose, approach it thirty times at cycle speed with the tool mass fitted, and measure the scatter of the stops with a dial indicator or a laser tracker. That scatter is the number your process will see.