Selection guide
Sizing a Vertical Linear Axis for a SCARA Arm
Short answer
Size the vertical axis for the complete moving mass, not the 500 g payload. In the worked example an 18.0 kg moving assembly needs 185.6 N of peak thrust and puts a 38.5 N·m moment on the carriage, so a 500 N-class belt-driven axis with a holding brake is the pick once the arm maker approves side mounting on the carriage.

On this page
- Do I size the vertical axis for the 500 g payload?
- How much thrust does a 2 m vertical axis need?
- How do I size the guide for the arm's cantilever moment?
- Does the arm maker allow side mounting on a moving carriage?
- Belt drive or ball screw for the vertical travel?
- What holds the load when the power drops?
- What do I compare between candidate vertical axes?
- Questions asked
Size the vertical rail for everything that moves: arm, adapter plate, end effector, cables and payload. In this class of machine the 500 g payload is under 3% of the lifted mass, so the arm dominates every number. The worked example needs 185.6 N of peak thrust and puts a 38.5 N·m overturning moment on the carriage, which lands the selection on a belt-driven vertical axis in the 500 N thrust class with a 2.4 N·m motor brake - plus the arm maker's written approval for side mounting on a moving carriage. The sections below give those numbers in the order you need them.
Do I size the vertical axis for the 500 g payload? #
No - the vertical axis carries the complete moving assembly, and in the example below the payload is under 3% of what you are actually lifting. Build the mass budget before you open a single datasheet, because every later number - thrust, moment, brake torque, motor current - comes from it. The table below is a calculated example with placeholder values in the right ranges for a small horizontal arm; replace each one with the figure from the mass-property drawing of the exact arm you shortlist.
| Item | Example mass | Where the real number comes from |
|---|---|---|
| SCARA arm, arm section only | 15.0 kg | arm datasheet mass properties |
| Adapter plate and fasteners | 1.0 kg | your CAD assembly |
| End effector or gripper | 0.8 kg | effector datasheet |
| Cable and hose allowance | 0.7 kg | energy chain or dressing estimate |
| Payload, maximum | 0.5 kg | application requirement |
| Complete moving mass | 18.0 kg | sum of the above |
The arm's own joints only ever carry the end effector and payload, so choosing the arm itself is a separate servo calculation - the one walked through in sizing SCARA robot servos for a 1 kg payload and reach. And because the payload's share of the total is so small, comparing candidate axes on payload ratings alone tells you nothing here; the moving assembly sets the size.
How much thrust does a 2 m vertical axis need? #
For the example, 176.6 N holds the load still and 185.6 N raises it at 0.5 m/s², so shortlist an axis in the 500 N continuous-thrust class, a 2.7x margin on the governing peak. Gravity is what separates this from sizing a long-stroke linear actuator for a 500 N push: on a vertical axis the load never unloads, so the axis holds the full weight the entire time it is parked, and the rating you compare against is a continuous one, not a peak.
Arithmetic for the example, using the summed mass from the table, with g = 9.81 m/s² and a vertical acceleration target a = 0.5 m/s², deliberately slow for an application that needs no speed:
- Static hold: F = m × g = 176.6 N
- Raising at full acceleration: F = m × (g + a) = m × 10.31 m/s² = 185.6 N
- Decelerating a descent: F = m × (g - a) = m × 9.31 m/s² = 167.6 N, not governing
Apply a design margin of 2 on the governing 185.6 N for guide friction, preload drag and wear over life: 2 × 185.6 N = 371 N, so an axis in the 500 N thrust class is the class to shortlist. At 0.5 m/s the full traverse takes 4 s, which fits the stated duty with room to spare.
How do I size the guide for the arm's cantilever moment? #
The arm's centre of mass sits out from the carriage face, so in the example the guide must take a 38.5 N·m overturning moment, which adds about 321 N to one bearing block when two blocks sit 120 mm apart. Work the moment in the arm's worst posture: fully extended normal to the rail, centre of mass as far from the carriage face as it ever gets. Take the offsets from the arm's mass-property drawing; the example uses 0.25 m for the arm's centre of mass and 0.35 m for the payload at full reach:
- Arm: 15.0 kg × 9.81 m/s² × 0.25 m = 36.8 N·m
- Payload: 0.5 kg × 9.81 m/s² × 0.35 m = 1.7 N·m
- Overturning moment on the carriage: 38.5 N·m
Convert that into guide loads when the datasheet speaks in forces rather than moments. Two blocks spaced L = 120 mm (0.120 m) apart share the 176.6 N direct load at 88.3 N each, and the moment adds ±M/L = 38.5 N·m / 0.120 m = 321 N, so the loaded block sees 88.3 N + 321 N ≈ 410 N. As the arm rotates, the offset sweeps from near zero to full reach, so always rate the guide on the extended posture.
Demand a carriage rated for at least twice the calculated moment, 77 N·m in this example, and run the manufacturer's equivalent-load formula with these forces; on a round-shaft axis that rating lives with the linear bearings and bushings riding the rail.
Does the arm maker allow side mounting on a moving carriage? #
Only if the documentation says so: published SCARA mounting orientations are table-top, floor, wall and ceiling, and side mounting to a moving vertical carriage is a separate case you must get approved in writing before comparing axes. The base bolts to a plate that itself travels, the joint-1 bearing set carries the arm's weight across its plane, and the lubrication has to live with that orientation. Get from the arm maker, in writing: allowable static and dynamic loads on the base and joint bearings in side orientation, any speed limits while the carriage moves, and the cable and connector arrangements they accept.
Published SCARA installation guidance asks for mounting-surface flatness around 0.05 mm/m and anchor bolts torqued to the installation manual's value. On a moving carriage your adapter plate inherits both duties: machined flat to that class, and stiff enough that clamping the arm does not bend it under the overturning moment.
Two architectures clear this hurdle differently. Some arm makers sell integrated vertical-axis SCARA models with the long Z built in; if one covers your full stroke, that route hands the mechanics, the stops and the single-vendor responsibility to one supplier. Otherwise buy the horizontal arm alone and hang it on your own external axis - which is what the rest of this article sizes.
Belt drive or ball screw for the vertical travel? #
A belt-driven axis: as a rule of thumb, a rotating ball screw gets awkward past about 1.5 m of stroke because its critical (whip) speed falls with unsupported length, and at this stroke the common answer is a belt, or a stationary screw with a rotating nut. Treat the 1.5 m figure as the rule of thumb it is and read the critical-speed curve in the screw datasheet before committing to any screw. The belt also puts the motor at one end, needs no intermediate screw supports along the travel, and allows a carriage as long as the moment load demands.
Belt drives backdrive freely, which sets the brake requirement in the next section. Drive torque for the example, with a 60 mm pitch-diameter pulley (r = 0.030 m) and an assumed drive efficiency of 0.90 covering belt and guide friction - take the real figure from the axis datasheet:
T = F × r / η = 185.6 N × 0.030 m / 0.90 = 6.2 N·m continuous at the pulley shaft.
Through a 5:1 gearbox the motor sees about 1.2 N·m continuous plus its own friction and inertia terms - ordinary mid-size servo or closed-loop stepper territory, and with 4 s per full traverse there is no peak-power problem to solve.
What holds the load when the power drops? #
A spring-applied, power-released brake on the motor, and in the example it must deliver at least 2.4 N·m at the motor shaft to hold 176.6 N on the load with a 2x safety factor through a 5:1 gear. The arithmetic:
- Holding torque at the pulley: F × r = 176.6 N × 0.030 m = 5.3 N·m
- Referred to the motor through the 5:1 gearbox at 0.90 efficiency: 5.3 N·m / (5 × 0.90) = 1.2 N·m
- With the 2x factor: specify a brake rated 2.4 N·m or better, spring applied, power released
The factor of 2 covers brake wear over life, belt tension change with temperature, and the extra belt tension the cantilever moment produces at full extension. One safety note: a raised carriage is stored energy, and the ISO 12100 risk-assessment process exists for exactly this hazard - lock out and mechanically block or capture the carriage before anyone works beneath it.
What do I compare between candidate vertical axes? #
Compare seven things, none of which is the 500 g payload: moving-mass rating, continuous thrust, carriage moment rating, side-mount approval, brake torque, stroke and controller integration - the table sets the pass levels from the worked example. Every level scales linearly with your own mass budget, so recompute them the moment the arm datasheet replaces the placeholder 15.0 kg.
| Requirement | Pass level from the worked example | Why it decides the selection |
|---|---|---|
| Moving mass, vertical orientation | rated for the complete moving assembly | the payload is under 3% of it |
| Continuous thrust | at least 2 x 185.6 N, so a 500 N class | gravity never unloads on a vertical axis |
| Carriage moment, worst posture | at least 2 x 38.5 N·m = 77 N·m | the arm cantilevers at full extension |
| Mounting orientation | written approval for side mount on a moving carriage | published orientations cover table, wall and ceiling |
| Holding brake | 2.4 N·m minimum at the motor, spring applied | a belt axis backdrives when power drops |
| Stroke | full working travel plus overrun and limit margins at both ends | the stated maximum is the requirement, not a target |
| Integration | coordinated axis in the arm controller, or clean IO handshaking | decides cycle structure and programming effort |
The decision, case by case. If an arm maker's integrated vertical-axis model covers the full stroke at your payload and speed, buy it and stop - one vendor then owns the mechanics and the stops. If it does not, take the arm-only route: written side-mount approval, a belt-driven vertical axis in the 500 N continuous-thrust class, a carriage rated 77 N·m or better about the horizontal axes, and a 2.4 N·m spring-applied motor brake, then verify positioning, cable behaviour and load holding over the whole travel at maximum payload before you sign the design off.
Questions asked
Does it matter that the real payload is probably closer to 200 g than 500 g?
No. Dropping from 0.5 kg to 0.2 kg removes 0.3 kg from the 18.0 kg moving mass, which is 2.9 N of thrust and well inside the 2.7x margin the selection already carries. Size on the 500 g maximum and spend the attention on the mass budget and the brake instead.
Can the SCARA's own Z quill cover the stroke instead?
Almost never. Built-in SCARA Z strokes run to a few hundred millimetres, an order of magnitude short of the 2 m travel this article sizes. Your options are the external vertical axis worked through here or one of the integrated long-stroke vertical-axis SCARA models some arm makers sell; check the documented stroke against your full travel before comparing anything else.
Why not just buy a much bigger axis and skip the calculations?
Because oversizing moves you in the wrong direction. A heavier carriage and drive raise torque and current demand every cycle, add to the overturning moment the guide must carry, and do nothing about the two things that actually sink these builds: missing side-mount approval from the arm maker and an undersized holding brake.
Should the external axis be coordinated with the arm's motion, or is a handshake enough?
If the arm only picks and places while the vertical axis is stationary, discrete IO handshaking is enough and far simpler: the arm requests a height, waits for in-position, then moves. If the arm must move while Z moves, the axis has to run as a coordinated axis inside the arm's controller, which narrows which arms and controllers qualify - decide this before shortlisting.