Selection guide
When multi-axis servo motion outgrows the PLC
Short answer
Keep every axis in one controller sized for the whole machine. Move motion off the PLC only when the rated axis count is exceeded, the synchronized group's motion task misses its cycle time, or certified SLS/SS1 monitoring needs a safety controller or drive-integrated safety. Otherwise divide by machine function, never by motion versus logic.

On this page
- The three limits that decide it
- Architecture options compared
- First limit: the rated axis count
- Second limit: the cycle budget of the synchronized group
- Where safe motion lives
- Divide by machine function, not by motion versus logic
- When a dedicated motion controller is the right call
- Commissioning checks before you lock the architecture
- The decision for each case
- Questions asked
Keep the motion in the PLC. A machine with eight servo axes, four tightly synchronized and four running independent point-to-point moves, fits in one controller sized for the job — and a split buys you a cross-controller interface that must carry commands, status and fault handling across a timing boundary. Motion earns its own controller only when a measured limit says so, and there are three: the rated axis count, the cycle budget of the synchronized group, and the certified partition of safe motion. Work them in order; the first one that fails sets the architecture. Below: the comparison table, the sizing checks, a worked cycle-budget calculation, and the decision for each case.
The three limits that decide it #
Decide in this order and stop at the first limit you hit.
- Rated axis count. Count every axis the runtime licenses and executes: each servo, a virtual master axis if your runtime counts one, an external encoder axis used as a master. If that count exceeds the supported figure for the exact controller model and motion license tier, step up a class in the same family; split only when no supported class covers it.
- Cycle budget of the synchronized group. The gearing or cam group sets the fastest task on the machine. Run it with every axis enabled and the full logic load, read execution time and jitter from the runtime diagnostics, and require execution plus worst-case jitter to sit inside the task period. A miss means the synchronized group needs a faster motion engine.
- Safe-motion partition. SLS and SS1 are certified functions, not logic code. They live in drive-integrated safety or in a separate safety controller on the same network — a partition that exists wherever the motion task happens to run.
None of the three says motion belongs in its own box. Two are measurements you take on the real load; the third is a safety partition that coexists with a single controller as easily as with two.
Architecture options compared #
Three layouts cover a machine like this, and the criteria that actually separate them are the ones in this table.
| Criterion | A: one controller runs logic and motion | B: PLC plus dedicated motion controller | C: drives run the profiles, PLC sequences |
|---|---|---|---|
| Axis ceiling | The figure printed for the controller model and its motion license | The motion controller's rated figure, on top of the PLC's own | Set by the drives and the network load |
| Synchronized gearing and cam | Native when the runtime includes gearing and cam objects | Native, inside a deterministic motion task | Only if the drives synchronize with each other themselves |
| Independent point-to-point moves | Fully capable | Capable, but adds an interface to maintain | Best fit: PLC sends position, speed and start |
| Diagnostics | One project, one tool chain | Two projects, two fault paths, one handshake | Per-drive tools plus the PLC |
| Safe motion, SLS and SS1 | Drive-integrated safety or a safety controller on the same network | The same, plus a safe-state hand-off to the second controller | Drive-integrated safety is the natural home |
| Integration risk | Lowest | Highest: heartbeat, mode hand-over, fault propagation | Moderate: one authority per axis must be defined |
Layout A is the default and the answer for most machines. Layout C is a per-axis choice you can mix into A, not a whole-machine replacement. Layout B exists for the two measured failures, not for taste.
First limit: the rated axis count #
Count real axes before you open a datasheet, and count them the way the runtime does. A nine-axis machine that calls itself eight is the classic trap: a spindle axis, a virtual master or an encoder axis can each add a seat the license charges for. If the count is not obvious — mixed real and virtual axes, an external encoder master — start with counting real axes before selecting a gantry motion controller, which walks the method.
Then read the supported-axis figure for the exact controller model and motion license tier, not for the product family; the same vendor's compact and rack platforms sit far apart on this number. Worked case: a compact family whose license supports eight servos, against a machine that has grown to nine. Nine needs a ninth seat the license does not offer, so the pivot is immediate — and the preferred fix is one controller class up in the same family, not a second controller bolted beside an unchanged PLC.
Second limit: the cycle budget of the synchronized group #
Set the motion task period from the synchronized group, not from the machine as a whole. The independent point-to-point axes tolerate a slower task or a drive-positioned interface; the gearing or cam group does not. Run the motion task on the same time base as the bus cycle, or at an integer multiple of it, so every setpoint lands on a bus tick. A setpoint the drive samples between two ticks arrives stale by up to a whole cycle — the nondeterminism that why PC-polled remote I/O cannot count encoder pulses for SCADA explains — and a follower axis converts that staleness into visible position steps. The smallest version of this timing discipline is a two-axis lift, and synchronizing two servo axes on one heavy lift walks it end to end.
Worked example. The figures below are illustrative inputs for this example, not a published rating; take your own from the runtime diagnostics with the real machine load.
- Bus cycle: 1 ms, with the bus's distributed clocks holding every slave's sampling to the same tick
- Motion task period: 1 ms, on that same time base
- Motion task execution, with every axis enabled and the gearing group running: 0.42 ms
- Worst-case jitter over a half-hour run: 0.05 ms
Check: 0.42 ms + 0.05 ms = 0.47 ms consumed of the 1 ms task period, so the task runs at 47 percent load and leaves 0.53 ms of reserve for communication handling and overrun. The group fits; no split is justified on this limit. Had the same measurement returned 1.1 ms of execution, the task would overrun every period and the follower would step at each miss — that measured failure, and only that, moves the synchronized group into a dedicated motion engine.
Where safe motion lives #
SLS and SS1 are drive safety sub-functions defined in IEC 61800-5-2. In plain terms: SS1 makes the drive brake the axis under controlled torque and then remove torque, and SLS holds motor speed at or below a configured limit while the function is active. The drive executes and monitors these with certified hardware, and a drive family offers them as a specific safety option, so verify each drive's safety documentation lists the functions you need before you select it.
The machine-level safety function is the layer above. The risk assessment defines it — which axes, which speed limit, which stop time — and the safety-related parts meet ISO 13849-1 or IEC 62061, with the function validated at the machine.
One safety note: a speed comparison written in the standard PLC task is not an SLS function no matter how fast it executes — specify each safe function from the risk assessment, implement it in certified safety hardware, and validate the response at the machine before production.
For the architecture decision the consequence is direct: safe motion changes where the monitoring lives, not where the motion task runs. The standard controller only receives the safe-state feedback and hands over as designed, so SLS and SS1 never by themselves force a dedicated motion controller.
Divide by machine function, not by motion versus logic #
When a machine outgrows one controller, the split that works is by station. Each controller owns its axes, its sequence and its local safety, and the stations exchange interlocks — part present, station ready, fault — not setpoints. A split by discipline, a motion controller beside a logic controller, instead creates an interface carrying target positions, status and faults across a timing boundary, and every signal on it needs a defined owner, update rate and timeout. Put a heartbeat on that interface on day one: each side stops its own axes when the other stops talking. Two controllers without a heartbeat are one machine with two places to fail silently.
When a dedicated motion controller is the right call #
The case is narrow and measurable. A dedicated motion controller earns its place when the synchronized group's task misses its period under full load, or when no supported controller class holds both the axis count and the cycle budget. It does not earn its place because motion feels like a separate discipline.
The independent point-to-point axes usually want something else entirely: drive-level positioning. The PLC sends target position, speed and a start command, and the drive runs the profile, detects the end point and handles the low-level control. That keeps the PLC task light and keeps the independent axes from loading the synchronized group's task. Run it as a hybrid — synchronized group in the PLC's motion objects, independent axes drive-positioned — but give each axis one authority: cyclic setpoints or a command interface, never both, with every mode transition written as an explicit step in the machine sequence.
Before adding a second box, be clear about what the second box changes: what an external motion controller does for servo drives covers what the device adds to the architecture and what stays where it was.
Commissioning checks before you lock the architecture #
Run these on the real machine under full load; a layout decided on an empty project is a guess.
- Enable every axis and run the synchronized group at its fastest profile; record motion task execution time, jitter and bus diagnostics such as lost frames over a sustained run. Any fault fails the layout.
- Repeat the measurement with the full logic program and HMI traffic running, not with a skeleton project.
- Confirm one authority per axis, and that every mode transition is an explicit sequence step.
- On any split layout, prove the heartbeat in test: stop one controller and confirm the other stops its own axes.
- After a drive or encoder replacement, verify the absolute position reference and homing offset before enabling the axis.
- Trigger each safety function and confirm the axis reaches the monitored state within the documented response, as part of the machine's safety validation.
The decision for each case #
- Both gates pass — axis count inside the license, execution plus jitter inside the period: keep all motion in the one controller, with SLS and SS1 in drive-integrated safety or a safety controller on the same network. That is the answer for the machine as described.
- Axis count exceeds every supported class: split by machine function, one controller per station, each owning its motion, logic and local safety, with a heartbeat on the station interface.
- Synchronized group misses its period under full load: step up a controller class if one exists that holds both the count and the cycle; otherwise move the synchronized group to a dedicated motion controller, and leave the independent axes drive-positioned.
- The safety requirement grows: it adds certified monitoring hardware and a machine validation; it never moves the motion task on its own.
One controller that passes both measured gates is the design this machine deserves; every split you make is a response to a measurement that failed.
Questions asked
How much cycle-time headroom should the motion task keep?
The pass condition is execution time plus worst-case jitter inside the task period, measured on the loaded system. The size of the reserve is a design decision you record in the specification: on the worked example the task kept roughly half its period free, which is a comfortable place to sit for a group you cannot afford to overrun. A task that passes only by a few percent deserves a re-measurement after the logic load grows.
What counts as an axis toward the controller's limit?
Read the runtime's license rules, because families differ. Most count every servo the controller executes. Many also count a virtual master axis used for electronic gearing, and some count an external encoder axis used as a master position source. Axes running purely in drive-positioning mode, where the controller only sends position, speed and start, may consume fewer or no seats on some platforms. The license table for the exact controller model and motion tier is the only reliable source.
Does needing SLS or SS1 change the encoder plan?
Possibly, and it is cheaper to decide now than after wiring. If monitoring sits in the drive's integrated safety, the drive's standard feedback interface usually stays as it is. If monitoring sits in a separate safety controller, that controller needs safe position data: a safety-rated encoder or redundant channels, published over the network's certified safety protocol. Check which route your risk assessment and drive documentation point to before ordering encoders, because the two routes accept different feedback hardware.
What fails first when the synchronized task is too slow?
The follower shows it before anything else. Gearing and cam setpoints that miss updates appear as position steps at the follower during speed changes, which reads on the machine as jerky follow, a following-error fault on acceleration, or audible stepping in the gearbox chain. Check the motion task's execution time and jitter first, because those numbers separate a timing problem from a tuning problem; gain changes will not fix a task that overruns.
Can the bus cycle and the motion task run at different rates?
Yes, with a rule. The two periods are set separately, but they must share one time base or sit at an integer multiple of each other, so every setpoint lands on a bus tick. The bus's distributed-clock mechanism locks each slave's sampling to a common tick, which removes the scatter between drives. A task slower than the bus holds setpoints between updates, which is acceptable for independent point-to-point axes and not for a synchronized gearing or cam group.