How-to
Calculating Servo Axis Acceleration for Torque Sizing
Short answer
Acceleration for servo torque sizing comes from the commanded profile, not a rule of thumb: a = v/t_a with ramp distance s_a = v²/(2a). Convert to motor torque with T = (m·a + F_process + F_friction)·p/(2π·η) + J_total·(2π·a/p), then check peak, continuous and inertia-ratio limits.
On this page
Derive the acceleration; do not assume it. Take the speed the process needs and the ramp time the cycle allows, compute a = v/t_a, check the ramp distance s_a = v²/(2a) against the move length, add the cornering demand v²/r, and convert the result into motor torque through the screw pitch and the rotating inertia. For the 150 kg ballscrew axis worked through below, 0.25 m/s with 0.1 s ramps, that gives 2.5 m/s², 3.7 N·m peak and 1.5 N·m RMS: inside a 750 W class servo for straight moves, outside it on 10 mm corners. Every number comes from the six steps that follow.
Where the acceleration number comes from #
Acceleration is a property of the commanded profile, not of the motor. ABB's trapezoidal move application note (AN00115) puts it plainly: acceleration is the slope of the velocity ramp, a = v / t_a. Advanced Micro Controls' motor sizing guide adds the fallback for when acceleration is unknown, labelled there as a rule of thumb: a trapezoidal profile that spends one third of the move time accelerating and one third decelerating, which works out to a = 4.5·s/T² and v = 1.5·s/T for a move of distance s in total time T. Use that to start; derive the real value once cycle time and speeds are fixed.
Two geometry facts do most of the damage later. A short move that cannot hold both ramps never reaches the commanded speed. A curved path needs path-normal acceleration even at constant speed, and it scales with v².
The calculation step by step #
- Fix the inputs. Commanded speed v, the shortest and longest moves in the real part programs, allowed cycle time, the smallest radius run at cutting speed, moving mass m, process force F_process, friction force F_friction, screw pitch p and diameter D, drive efficiency η, and the rotating inertias of rotor, screw and coupling.
- Compute the straight-line demand. a = v / t_a and ramp distance s_a = v² / (2a). If the move is shorter than 2·s_a the profile is triangular and the axis never reaches v, so the shortest move sets the check, not the longest.
- Add the path geometry. On a radius r at path speed v the axes see a_n = v²/r continuously. An ideal sharp corner would need unbounded acceleration, so the controller must cap corner speed or blend the corner; that cap is a torque decision you compute.
- Convert to torque at the motor. Linear force F = m·a + F_process + F_friction. Torque to push it through the screw: T_linear = F·p / (2π·η). Angular acceleration α = 2π·a / p. Torque to accelerate the rotating parts: T_accel = J_total·α, with J_total = J_rotor + J_screw + J_coupling + m·(p/2π)², and a solid steel screw J_screw = (π/32)·ρ·L·D⁴ with ρ = 7850 kg/m³.
- Apply the sizing factor. Oriental Motor's documented selection procedure computes required torque as (load torque + acceleration torque) × safety factor; 1.5 to 2 is the common range, a rule of thumb. Use the low end on measured loads, the high end on estimates.
- Check the limits. Continuous torque against the cruise and the cycle RMS, the drive's documented peak envelope against the ramps, the reflected inertia ratio against tuning guidance, and the controller's ability to command the profile at all.
Worked example: 150 kg ballscrew axis at 0.25 m/s #
Example inputs, declared rather than measured; take η and rotor inertia from the datasheets of the exact parts:
- moving mass m = 150 kg
- screw: solid steel, D = 32 mm, pitch p = 5 mm, supported length L = 1.0 m
- coupling J = 1.0×10⁻⁵ kg·m²; motor rotor J = 1.1×10⁻⁴ kg·m² (750 W class)
- F_process = 150 N, F_friction = 75 N, η = 0.90
- v = 0.25 m/s, t_a = 0.10 s, move 100 mm in 0.5 s, then 0.5 s dwell, repeating
Arithmetic, a calculated example for these inputs and not a measured result:
- a = v/t_a = 0.25 / 0.10 = 2.5 m/s²
- s_a = v²/(2a) = 0.0625 / 5.0 = 12.5 mm per ramp, 25 mm for both, so any move under 25 mm stays triangular
- J_screw = (π/32)·7850·1.0·(0.032)⁴ = 8.1×10⁻⁴ kg·m²
- J_table = m·(p/2π)² = 150 × (0.000796)² = 9.5×10⁻⁵ kg·m²
- J_total = 8.1 + 0.95 + 0.10 + 1.10 (all ×10⁻⁴) = 1.02×10⁻³ kg·m², of which 79 % is the screw, 11 % the rotor, 9 % the table and 1 % the coupling: the screw dominates, not the payload
- α = 2π·a/p = 15.71 / 0.005 = 3142 rad/s²
- T_accel = J_total·α = 1.02×10⁻³ × 3142 = 3.2 N·m
- F = 150×2.5 + 150 + 75 = 600 N, so T_linear = 600 × 0.005 / (2π×0.90) = 0.53 N·m
- Peak demand = 3.2 + 0.53 = 3.7 N·m; with the 1.5 safety factor that is 5.6 N·m of capability required
- Cruise torque = 225 × 0.005 / 5.65 = 0.20 N·m at v/p = 50 rev/s = 3000 rpm
- Cycle RMS = √((0.1×3.7² + 0.3×0.20² + 0.1×3.0² + 0.5×0²)/1.0) = √2.28 = 1.5 N·m, where 3.0 N·m is the braking torque because friction and process force help decelerate
Motor side, still declared inputs: 750 W at 3000 rpm gives T = P/ω = 750 / 314 = 2.4 N·m continuous. Assume the drive documents 3× rated for a few seconds, so 7.2 N·m peak; substitute the datasheet envelope before ordering anything.
Cornering is where the margin goes #
On a 10 mm radius at 0.25 m/s, a_n = v²/r = 0.0625 / 0.010 = 6.25 m/s², which is 2.5 times the straight-line demand. Torque at that acceleration is J_total·α = 1.02×10⁻³ × 7854 = 8.0 N·m plus 1.0 N·m of linear load through the screw, so 9.0 N·m, past the 7.2 N·m assumed envelope.
The decision comes from the same arithmetic written as a torque balance, T = 1.41·a + 0.20 N·m: 1.28 per m/s² from J_total·2π/p, 0.13 from the 150 kg through the screw, and 0.20 steady from process and friction. Setting T = 7.2 leaves about 5.0 m/s² available, so the corner speed cap is v = √(a·r) = 0.22 m/s on 10 mm radii, 0.18 m/s if the 1.5 safety factor is kept in the corners, and 0.16 m/s on 5 mm radii. If the process cannot live with those caps, the alternatives are a larger motor or added reduction, a tradeoff covered in choosing servo gearing for a ballscrew router axis.
The checks that decide the motor #
| Check | This example | Decision |
|---|---|---|
| Continuous torque | 1.5 N·m RMS vs 2.4 N·m rated | Fits, with margin |
| Peak torque | 5.6 N·m with safety factor vs 7.2 N·m assumed | Fits; confirm the real envelope |
| Inertia ratio | 9.15×10⁻⁴ / 1.1×10⁻⁴ = 8.3:1 | Standard tuning range |
| Cornering | 9.0 N·m at 10 mm radius | Cap corner speed or upsize |
| Bus power | 3.7 N·m × 314 rad/s = 1.2 kW transient | Check supply and bus; each decel returns ½Jω² ≈ 50 J |
Field guidance on the inertia ratio is consistent across drive makers: systems tune readily to roughly 15:1, 20:1 to 25:1 is obtainable but demands notch filters and feedforward, and past that is not a practical target. Treat those as design cautions rather than hard limits. At 8.3:1 this axis sits in the easy range, and the tuning work itself is what tuning a servo axis with a 6:1 ballscrew inertia ratio covers.
Prove it on the machine #
Run the representative part programs and watch following error, cycle time and motor temperature against the calculation. If cycle time misses, identify the limit first, whether controller trajectory generation, the corner speed caps, torque or machine rigidity, before buying a bigger motor. When you raise the ramps to chase cycle time, expect the drive to object, which is why a servo faults when acceleration ramps increase. Many drives will verify the inertia assumption for you through tuning that estimates inertia and checks motor protection; compare its number with your J_total. Prove the finished profile at reduced speed and torque limit, guards closed and the stop function tested per the machine's risk assessment, before running full-performance moves.
Questions asked
I only know the move distance and the cycle time. What acceleration should I size to?
Use the one-third rule of thumb: a trapezoidal profile with acceleration, cruise and deceleration each taking a third of the move time gives a = 4.5 × s / T² and a peak speed of 1.5 × s / T. For a 100 mm move in 0.5 s that is 1.8 m/s² and 0.30 m/s. It is a starting point, not a datasheet value, so run the full torque calculation on it before selecting a motor.
How short does a move have to be before the axis never reaches cutting speed?
When the distance is below twice the ramp distance, 2 × s_a = v²/a, the profile is triangular. At 0.25 m/s and 2.5 m/s² that is 25 mm: both ramps consume the whole move and the commanded speed is never reached. Check the ramp distance against your shortest real move, not your longest, because adaptive toolpaths are full of short segments.
Does adding a gearbox or belt reduction change the acceleration torque?
Yes. Torque required at the motor falls by the ratio i and by the efficiency, and the reflected load inertia falls by i², which is why reduction fixes a high inertia ratio. But motor speed rises by i: a 2:1 reduction on a screw turning 3000 rpm asks the motor for 6000 rpm, which many servos cannot deliver. Recheck rated speed before committing to reduction.
Can I measure the load inertia instead of calculating it?
Often, yes. Many servo drives run an inertia identification or auto-tuning routine that reports the load-to-rotor inertia ratio; compare it with your calculation and investigate any large gap. On the bench you can also divide a known constant torque by the measured angular acceleration. Use the measured value to re-run the torque check before finalizing the motor choice.
What safety factor should I apply to the calculated torque?
Oriental Motor's selection procedure multiplies load plus acceleration torque by a safety factor; 1.5 to 2 is the common range and a labelled rule of thumb. Use the low end when mass, friction and process force are measured and the high end when they are estimates. In the worked example, 1.5 turns a 3.7 N·m peak into a 5.6 N·m capability requirement.