Same scan does not mean synchronized servo axes

Servo and stepper motion Published 9 min read By AutomateDirectUSA engineering team

Short answer

Starting three pulse-commanded servo drives in the same PLC scan launches three independent trajectories, not one synchronized motion. Synchronization is decided by relative surface displacement during the interval the axes share the work, measured against the process tolerance. Axes that must stay locked need a master–follower or electronic-gearing relationship; axes judged only on their own endpoints can run as independent pulse moves with approximate simultaneous starts.

On this page
  1. Do servo axes start synchronized when one PLC scan pulses them all?
  2. What actually decides whether two axes stay synchronized?
  3. How far apart do identically commanded axes drift during a shared move?
  4. When is independent pulse positioning good enough?
  5. What does electronic gearing add that simultaneous starts cannot?
  6. Is linear interpolation the feature that fixes this?
  7. Which architecture fits which synchronization case?
  8. How do you verify synchronization once the machine runs?
  9. Questions asked

Starting three pulse-commanded servo drives from one PLC scan launches three independent trajectories at nearly the same instant; it does not create synchronized motion. The quantity that decides synchronization is relative surface displacement between the driven surfaces during the interval they share the work, judged against the process tolerance. That splits the decision cleanly: axes that must stay locked through ramps, speed changes and load disturbance need a master–follower or electronic-gearing relationship, with follower position derived from master position every control cycle, while axes judged only on their own endpoints run fine as independent pulse moves with approximate simultaneous starts. The worked example below puts numbers on the boundary between the two cases.

Do servo axes start synchronized when one PLC scan pulses them all? #

No: one scan issues three separate move commands at close to the same instant, and each servo drive then generates its own trajectory and closes its own position loop on its own encoder, so the shared starting instant couples nothing.

A pulse-commanded drive treats the pulse train as its command and keeps the position loop inside the drive, on the motor encoder. From the controller's side the command path is open loop unless encoders are wired back for monitoring. Between the common start and steady motion sit several independent terms: command latch order inside the scan, each axis's own acceleration ramp, each drive's following error under its own load, and the gear ratios and roller diameters behind each motor. Set up and prove out each pulse-output axis on its own first, following the sequence for configuring a PLC pulse-output servo axis before its first position moves, because a configuration fault and a synchronization fault are different problems with different fixes.

What actually decides whether two axes stay synchronized? #

Relative surface displacement between the driven surfaces during the interval they share the work decides it: keep that displacement inside the process tolerance and the axes are synchronized for that process; exceed it and no shared start instant repairs the move.

Name the interval first. In a grip-and-transport process it is the window when two rollers both constrain the sheet; outside that window the axes may move independently by any amount. Inside it, the only measurement that matters is how far one driven surface moves relative to the other, in product travel, against what the product tolerates.

Endpoint checks do not cover this. A machine can reach every commanded final position correctly and still stretch, crease or misregister the product between those positions, because synchronization for shared work is a property of the whole trajectory across the interval, not of the endpoints. State the tolerance as an input — a sheet stretch limit, a registration band, a nip mismatch allowance — before comparing architectures.

How far apart do identically commanded axes drift during a shared move? #

On worked-example numbers, a 0.5 mm difference in effective roller diameter leaves two axes commanded to the same speed slipping about 3.9 mm over a 1.0 s shared contact, roughly eight times an example 0.5 mm registration tolerance.

Worked example, calculated for these inputs, not measured. Two rubber rollers, each driven by its own servo through a 10:1 gearbox, both motors commanded to 1500 rpm. Roller A effective diameter 50.0 mm; roller B worn to 49.5 mm. Shared grip interval 1.0 s; the process tolerates 0.5 mm of relative sheet travel between the surfaces.

Roller surface speed: v = pi × D × n / (60 × G), with D the effective roller diameter in mm, n the motor speed in rpm, and G the motor revolutions per roller revolution.

  • Roller A: pi × 50.0 × 1500 / (60 × 10) = 392.7 mm/s
  • Roller B: pi × 49.5 × 1500 / (60 × 10) = 388.8 mm/s
  • Slip rate: 392.7 - 388.8 = 3.9 mm/s
  • Relative displacement over the grip: 3.9 mm/s × 1.0 s = 3.9 mm, about eight times the tolerance
  • Surface-speed match required to pass: 0.5 mm/s divided by 392.7 mm/s = 0.13 %

Equal commanded RPM passes nothing here, because the diameters eat the tolerance. Trajectory shape hurts too: if roller A reaches commanded speed in 0.05 s it covers 392.7 × 0.05 / 2 = 9.8 mm while ramping, roller B reaching the same speed in 0.10 s covers 392.7 × 0.10 / 2 = 19.6 mm, and the roughly 9.8 mm relative offset exists before either axis reaches steady speed. For scale, a 0.5 ms start skew between the outputs at that surface speed adds only about 0.2 mm — real, but small next to the ramp term. These are calculated examples for these inputs, not measured results; a real machine adds following error and mechanical compliance on top, in the same direction.

When is independent pulse positioning good enough? #

Independent pulse positioning is the right tool when each axis is judged against its own endpoint and the process tolerates the relative drift you calculated: if the allowed relative displacement is larger than slip, skew and ramp offset together, separate moves from one scan are fine.

Turn the tolerance into a pass/fail number: stack the worst case as start skew × surface speed + ramp offset + slip rate × interval, and compare the stack with the allowed relative displacement. On the worked example the stack lands near 13.7 mm against the example allowance, so independent pulses fail there; shortening the shared contact to 0.1 s cuts the slip term to about 0.4 mm but leaves the ramp term untouched, because ramp offset scales with ramp times, not with the interval.

The classic three-axis case splits the same way. A center roller feeding continuously while two outer axes index forward and return to their own registered positions between contacts is three independent position moves: each outer axis is judged by repeating its own stop position, a per-axis position-control requirement covered in why a servo axis needs position control to stop at the same position, and approximate simultaneous starts are enough. The moment the outer axes must advance at the center roller's surface speed while the sheet is clamped, endpoint thinking no longer applies and the axes need a relationship, not a shared start time.

What does electronic gearing add that simultaneous starts cannot? #

Electronic gearing reproduces a mechanically keyed shaft pair in software: the follower's position is a defined ratio of the master's actual position, re-evaluated every control cycle, so diameter, ratio and ramp differences are engineered out instead of hoped away.

Because the follower tracks the master's measured position rather than a replayed command, the ratio holds through acceleration, deceleration and load disturbance: enforce a position ratio and equal surface speeds follow wherever the mechanics match — and where they do not, ratio compensation restores them. Gearing the worn roller faster by 50.0 / 49.5 = 1.0101, a 1.0 % ratio increase, cancels the worked example's diameter difference exactly. A cam generalizes the same idea: follower position follows a profile of master position instead of one fixed ratio, which is what a cycle with transport, dwell, return and re-engagement needs.

Engage the relationship while the surfaces are still separate, on a position match; snapping a follower onto a moving master with a velocity step produces a torque transient the product feels. Where the follower must also hold registration against a moving master, gearing with on-the-fly correction is the established pattern, set out in setting up servo electronic gearing with registration correction. And where several axes must hold one relationship with no natural master, gear them all to a virtual master as in synchronizing four servo lift axes with one virtual master.

Is linear interpolation the feature that fixes this? #

Linear interpolation coordinates two or more axes to arrive at a common endpoint together along a defined path — the right feature when the axes form one geometry, and the wrong tool when two surfaces must hold a speed ratio through contact and then break away.

In an interpolated move from (0, 0) to (600, 300), the controller commands both axes so they finish together, one moving faster than the other along the way. That coordinates a single geometric move. It does not hold two rollers at equal surface speed through a grip, and it does not manage engage, transport and release; those are relationship functions — gearing for fixed ratios, cams for profiled ones. A pulse-output positioning controller without gearing and cam functions cannot hold a ratio no matter how carefully its moves are sequenced, so when choosing a controller, check the relationship functions, not just the axis count and pulse rate.

Which architecture fits which synchronization case? #

The decision follows the relationship, not the brand: independent pulse outputs for per-axis endpoint moves, gearing for one follower locked to one master, a virtual master when several axes gear to a common reference, and a coordinated-motion controller on a shared drive network when many axes need path-level coupling.

  • Independent pulse positioning — each axis closed on its own endpoint, approximate simultaneous starts acceptable; one high-speed pulse output per axis.
  • Master–follower electronic gearing — one real master axis, followers locked to its measured position; the shared-contact case in the worked example.
  • Virtual master — several axes holding one relationship with no natural mechanical master; the controller runs a virtual axis and gears every real axis to it.
  • Coordinated motion on a shared drive network — many axes, path-level coupling, or relationships changed on the fly; this is where a pulse-only architecture is outgrown, as laid out in when multi-axis servo motion outgrows the PLC.

On a shared drive network, one motion clock reaches every drive, and the practical tracking limit becomes how often each follower receives a fresh command — what a fieldbus command update rate decides for servo axes. That single clock is also why tightly coordinated platforms pull every axis onto the drive network instead of mixing in pulse-only axes; the design reasoning is covered in why coordinated-motion platforms need EtherCAT for third-party axes. Match the architecture to the relationship the process needs, then choose the controller that implements it.

How do you verify synchronization once the machine runs? #

Capture each axis's actual position from its drive and overlay the traces across the shared interval: the process is synchronized when relative displacement between the traces stays inside the tolerance, and it is not the moment the traces fan apart, whatever the endpoints do.

Work the checks from cheapest to most involved:

  1. Overlay position traces at a cycle boundary: a registration error that grows by a fixed amount each cycle points to independent starts or a ratio error, not to tuning.
  2. Compare commanded and achieved speed: a follower that quietly never reaches its commanded speed shifts the working ratio, as covered in why a servo axis never reaches its commanded speed.
  3. Read following error around engagement: a step or sign flip at engagement points to feedback scaling or inverted command and feedback wiring, and an error that swells through the move points to tuning or load; drive diagnostic documentation lists these causes.
  4. Correlate torque demand with engagement: axes fighting through the product show torque spikes as the grip closes — correct the relationship before touching motor size.

Reset a servo drive alarm only with that drive's run signal off, as servo drive manuals require, so a cleared fault cannot restart an axis under your hands; treat ratio and profile edits on a running machine as guarded adjustments under the plant's lockout and risk-assessment practice.

The decision, stated once: traces inside the tolerance mean the architecture as built is right, whether that is independent pulses or gearing; traces fanning apart mean add or repair the relationship — gearing, ratio compensation, a virtual master — because no faster simultaneous start will close the gap.

Questions asked

Does reading each encoder back into the PLC make same-scan starts synchronized?

No. Feedback gives the controller a picture of where every axis actually is, which is valuable for monitoring, verification and correction, but it does not couple the axes. Coordination has to exist in the command structure, with each follower's commanded position derived from a master's actual position through gearing or a cam. Encoders without a relationship function are instrumentation, not synchronization.

How fast must the pulse outputs be for three axes?

The command pulse rate per axis is the position resolution in pulses per revolution times the shaft speed in revolutions per second. For example, at 10000 pulses per revolution and 1500 rpm, one axis needs 1500 divided by 60, times 10000, which is 250000 pulses per second, and each axis needs its own output sustaining that rate. Confirm both numbers against the drive's electronic gear setting and the controller output's documented maximum pulse rate.

What changes the slip number in the worked example?

The slip scales linearly with all three inputs. Halving the diameter difference halves the slip rate; halving the shared interval halves the accumulated displacement; slowing the rollers scales it with speed. The demanding input is usually the speed match: the example needs surface speeds equal within about 0.13 percent, and mechanical matching alone rarely holds that, which is why ratio compensation through gearing is the reliable correction.

Does a higher-resolution encoder improve synchronization?

Not by itself. Encoder resolution decides how precisely each drive knows its own position; synchronization is decided by the command relationship between axes. Higher resolution slightly tightens a follower's tracking of its master and makes verification traces cleaner, but an axis with no master relationship stays unsynchronized at any resolution. Put the relationship in place first, then spend budget on resolution and tuning.

Keep reading

  • Comparison

    Lathe Electronic Gearing: PLC Pulse Output vs Divider

    Gear a lathe leadscrew to the spindle with a drive-side numerator/denominator divider for multi-pass threading: it holds the ratio exact per count and works in both rotation directions. The PLC path — measure spindle encoder frequency, output a scaled pulse frequency — is adequate for feed-per-rev crossfeed and single-pass threads, where a 1 Hz output quantum costs about 0.16% pitch error at the example's 317.5 Hz.

    Servo and stepper motion

  • How-to

    Setting Up Servo Electronic Gearing With Registration Correction

    Gear the folder servo to the web encoder with one fixed electronic gear ratio and apply registration error as a bounded phase trim ramped across the 100 to 200 ms between corrections. At 150 m/min a 0.1 mm tolerance is 40 microseconds of web travel — about eight 0.0127 mm increments — so doubling or halving a pulse train for six pulses trips following error, while a ramped trim changes speed by 0.04 percent.

    Servo and stepper motion

  • How-to

    Synchronizing Four Servo Lift Axes With One Virtual Master

    Create one virtual master axis, gear all four real lift axes to it with MC_GearIn at 1:1, and command only the master with MC_MoveJog; every follower then receives the same position command at the same instant and stops with it. Because a follower fault does not stop the master, add a programmatic group stop that withdraws jog permission and stops the master. Reference each absolute encoder once against a physical sensor, since stored encoder position identifies shaft angle, not lift level.