Short answer

No formula turns oz-in torque or a payload mass into a supply voltage. Size the motor-gearbox pair from continuous and peak duty, select a documented motor-drive pair that covers it, and supply exactly the AC or DC input range its datasheet names. For a fixed arm on building power that lands in the single-phase 200-240 V AC class; three-phase above roughly 1.5 kW.

On this page
  1. Torque decides current, not voltage
  2. What your five axes decide
  3. The supply requirement comes from the drive datasheet
  4. AC-fed or DC-fed: the architecture decision
  5. The decision for your arm
  6. Questions asked

Your oz-in torque table and the payload mass do not contain a voltage, so there is nothing to compute and no DC number to pick. Torque and payload size the motor and gearbox through the duty cycle; the servo drive you pair with that motor carries the only supply requirement in the system, the AC or DC input range printed in its datasheet. The sequence is therefore fixed: resolve each axis's continuous and peak demand, select a documented motor-drive pair that covers it, then build the supply that drive names. For a stationary arm on building power, the architecture is AC mains into each drive; DC input earns its place only on battery-fed or shared-bus machines. The sections below run that sequence against your five axes, with the arithmetic shown.

Torque decides current, not voltage #

A servo motor produces torque in proportion to its current, through the torque constant printed on its datasheet. Once your torque figures are resolved into continuous and peak demand at the motor shaft, they fix two electrical quantities: the motor frame that survives the continuous demand thermally, and the drive's continuous and peak current rating. Speed is where voltage actually appears. The winding generates back-EMF in proportion to speed, and the drive's internal DC bus has to stay above that EMF plus the resistive and inductive drops at top speed.

The drive performs both conversions internally: supply in at its terminals, controlled current out to the motor. That is why the supply requirement lives on the drive datasheet, stated as the input voltage range over which the drive operates, together with a permissible frequency band — 50/60 Hz ±5% is typical of drive specification tables. No oz-in figure enters that line, and the payload mass enters it only after it has changed your torque and speed numbers. The electrical quantity your torques genuinely determine is current, worked through step by step in calculating servo motor current from required torque.

What your five axes decide #

The ranges you listed cannot drive any selection until three questions are answered per axis: whether the low value means continuous and the high value peak; whether the torque is required at the arm joint or at the motor shaft; and what speed and cycle time accompany it. The table converts your figures to SI units so they can be tested against real loads.

Axis Reported torque (oz·in) Same torque (N·m) What it does not yet tell you
1 226.57–478 1.60–3.38 continuous vs peak; joint vs motor shaft; speed
2 756–1590 5.34–11.23 gravity and acceleration terms of the payload
3 356–749.7 2.51–5.29 same unresolved inputs
4 188–395 1.33–2.79 same unresolved inputs
5 17.7–37.2 0.125–0.263 same unresolved inputs

Conversion factor used throughout: 1 oz·in = 0.00706 N·m.

Worked example: axis 2 against the payload #

Take the worst case honestly. Place the 50 kg payload at a 0.5 m radius from the axis-2 joint (an assumed geometry — set it from your arm's drawing) and hold it statically against gravity:

T_gravity = m × g × L = 50 kg × 9.81 m/s² × 0.5 m = 245 N·m at the joint.

The reported axis-2 maximum is 1590 oz·in × 0.00706 = 11.2 N·m, which is about 4.6% of that static gravity torque, before any link mass, acceleration or imbalance. Whichever shaft those numbers were estimated at, they cannot yet be compared against the payload.

Reduction changes the motor-side figure, not the physics. Holding that joint through a 100:1 reduction at 70% efficiency (illustrative inputs) needs 245 ÷ (100 × 0.7) = 3.5 N·m at the motor continuously, already near the reported peak. Acceleration adds its own term, derived per axis in calculating servo axis acceleration for torque sizing. Selection only proceeds when every operating point of the cycle — hold, lift, lower, accelerate — sits inside a candidate motor's continuous region, with peaks inside its short-time region.

The supply requirement comes from the drive datasheet #

You select a motor-drive pair the way drive makers document it: motor and drive from the same family or a documented compatibility list, sized on the duty. The drive datasheet then states the supply as a range — the input voltage over which the drive operates, the phase count it needs, and the frequency band. Two documented examples show the spread. Rockwell Automation's Kinetix 5700/5500/5300/5100 and ArmorKinetix servo drives list a 324–528 V AC three-phase input when their DC-bus voltage regulation mode is off (technical document KNX-TD003), while the small-drive class commonly lists single-phase mains input at 200–240 V.

Whether that input is called AC or DC is a property of the drive, not a decision you make per motor. AC-input drives rectify internally and feed their own DC bus; DC-input drives hand that job to an external supply or a shared bus, and their datasheet names the DC range that supply must hold.

AC-fed or DC-fed: the architecture decision #

Supply architecture What you provide Documented example Where it fits
Single-phase 200–240 V AC, one feed per drive a mains circuit with disconnect and overcurrent protection; the drive makes its own bus small servo drives list single-phase input in this range fixed machines on building power, small-drive class
Three-phase at the same voltage class a three-phase feed the input class above the single-phase drives axes above the single-phase class, shops with three-phase already
Three-phase 324–528 V AC a higher-voltage plant feed Kinetix 5700/5500/5300/5100/ArmorKinetix, 324–528 V AC with DC-bus regulation off high-power axes on a 400 V plant supply
External DC bus at the drive's documented voltage a DC supply sized for peak and regenerative duty, or a shared multi-axis bus brushed DC drives ran motors rated 140 V DC from a measured ~170 V DC bus battery-fed and mobile machines, shared-bus cells

Two sizing items ride along with the choice. Power class: selection guides put the single-phase mains class on drives up to roughly 750 W to 1.5 kW, three-phase above — a rule of thumb, not a boundary, so read the specific drive's input specification. Regeneration: every descent of a vertical axis returns energy to the bus, which mains-fed drives bleed off through a braking resistor or share across a common bus; undersized handling trips the drive on overvoltage.

The DC row deserves the concrete example, because it answers how much in DC the only honest way. One documented service case ran brushed DC servo motors rated 140 V DC at 8.6 A from drives whose bus measured about 170 V — the peak value of rectified 120 V AC mains, √2 × 120 V ≈ 170 V, minus load sag. Motor rating and bus voltage are different numbers, connected only by the drive's documentation. Nobody computed that 170 V from a torque table.

The decision for your arm #

  1. Rebuild the torque table at the correct shafts. Start with axis 2's gravity term — 245 N·m at the joint for the payload at a 0.5 m radius — and add link masses, acceleration and cycle timing. No supply decision survives bad inputs.
  2. Select reduction and motor per axis so the full cycle sits inside the motor's continuous region; the motor-type choice and the duty method are laid out step by step in stepper vs servo motor selection by torque and duty. Take the matching drive from the same family's documented compatibility list.
  3. Take the supply from that drive's input line. After realistic high reduction this arm lands in the small-drive class, so expect one single-phase mains circuit per drive in the 200–240 V class. If any axis sizes above the roughly 1.5 kW single-phase class, move that axis to a three-phase drive — at that voltage class, or a documented 324–528 V class on a 400 V plant.
  4. Choose DC only if the machine is battery-fed or built on a shared bus, and then the DC voltage is whatever the DC-input drive documents — never a number derived from oz-in.

Wire mains-voltage drives behind the disconnecting device and overcurrent protection that IEC 60204-1 requires for a machine's electrical equipment, and do the wiring under lockout.

Committed answer: for a fixed arm on building power, AC — one single-phase feed per small drive in the mains voltage class above as the working assumption, three-phase for any axis above that class. There is no DC voltage in your torque table to calculate, and none is needed until a DC-input drive selection forces the question.

Questions asked

Should I shop for 24 V or 48 V servo motors for a small arm?

Only for light, battery-fed axes. Low-voltage DC brushless servo pairs exist and take a 24-48 V class supply, but an arm carrying 50 kg with realistic reduction lands in the mains-input class. Buy the motor-drive pair whose documented input matches your supply; the motor's nominal voltage is not a separate selection from the drive.

Can a servo drive run from a 48 V DC bench supply?

Only a drive documented for a low-voltage DC input. A mains-input drive needs the AC range and phase count printed in its datasheet and will not start from 48 V DC. Size the DC supply beyond the drive's continuous current too, because peak acceleration current can collapse an undersized supply and trip the axis.

Does a higher supply voltage give the motor more torque?

No. Torque follows current through the motor's torque constant, so a torque shortfall is fixed with a larger motor and drive, not more volts. Voltage sets the speed ceiling: the drive's bus must stay above the winding's back-EMF plus drops at top speed, and the documented input range is sized to do that.

Single-phase or three-phase supply for this arm?

Rule of thumb from drive selection guides: single-phase 200-240 V serves drives up to roughly 750 W to 1.5 kW, three-phase above that class. After high reduction, most axes of this arm fall in the single-phase class; any axis that sizes above it takes a three-phase drive, and some larger drives derate on single-phase feed.

Why do the oz-in torque numbers matter at all?

They size the motor and the drive current after reduction, and in this arm they flag a problem: axis 2's reported 11.2 N·m peak is about 4.6% of the 245 N·m gravity torque of the payload at a 0.5 m radius, so the numbers must be re-derived at the correct shaft before any drive selection.

Keep reading

  • Selection guide

    Servo Motor Sizing for a Knee Mill Retrofit

    Size each retrofit axis from its own numbers — moving mass, screw lead, rapid speed, acceleration, cutting thrust and belt ratio — not from wattage. In the worked knee mill X axis, a 750 W-class servo (2.39 Nm rated) behind a 2:1 belt makes about 4.8 Nm at the screw before losses against roughly 1.8 Nm of peak demand, so it passes; the 6 Nm class buys margin. A quill-only Z usually needs no brake; a knee-driven Z does unless its screw provably cannot backdrive.

    Motors, gearboxes and drives sizing

  • Selection guide

    Stepper vs Servo Motor Selection by Torque and Duty

    Pick the motor by comparing worst-case torque demand at the top commanded speed with the motor-and-drive torque-speed curve: a stepper needs at least 1.5x pull-out margin there and a reflected inertia under 10:1; a servo needs cycle RMS torque within its continuous rating. Feedback decides the rest: choose a servo whenever an undetected position error is unacceptable.

    Motors, gearboxes and drives sizing

  • How-to

    Calculating Servo Axis Acceleration for Torque Sizing

    Acceleration for servo torque sizing comes from the commanded profile, not a rule of thumb: a = v/t_a with ramp distance s_a = v²/(2a). Convert to motor torque with T = (m·a + F_process + F_friction)·p/(2π·η) + J_total·(2π·a/p), then check peak, continuous and inertia-ratio limits.

    Motors, gearboxes and drives sizing