Comparison
Timed Dwell at Full Extension for a Pneumatic Cylinder
Short answer
Hold the directional valve commanded forward after the extended-position signal trips, and delay only the reversal command. An all-pneumatic delay (meter-in flow control feeding a small reservoir that slowly builds pilot pressure) fits simple cycles; a recycling solid-state timer or PLC timer driving the solenoid valve fits when timing accuracy, adjustment, or coordination with other machine logic decides. Timing accuracy is the decision criterion.

On this page
- How does a timed dwell at full extension work?
- Which control method fits: reservoir, delay valve, timer, or PLC?
- How do you build the all-pneumatic reservoir delay?
- When does a dedicated time delay valve fit better?
- How accurate is each timing method?
- How do you connect a timer or PLC to the valve?
- How do you commission and verify the dwell?
- Which method should you build?
- Questions asked
A pneumatic cylinder can sit fully extended, under forward pressure, for a controlled dwell and then reverse, without the forward command ever dropping. Detect the extended position, delay only the reversal signal, and pick the delay element on timing accuracy: a meter-in flow control filling a small reservoir for air-only, seconds-class timing; a dedicated time delay valve for a documented adjustable band; or a recycling solid-state timer or PLC timer driving the solenoid valve when the dwell must be set, repeated and logged like any other machine number. This article compares the three paths, works the reservoir sizing arithmetic, and ends with the build decision for each case.
How does a timed dwell at full extension work? #
The valve that extends the cylinder stays commanded forward for the whole dwell, and you delay only the signal that reverses it; the dwell starts when the extended-position limit signal trips and ends when that delayed reversal command shifts the valve.
The trick is which command you delay. On a double-acting cylinder fed by a 5/2 directional valve, the forward position must stay commanded — solenoid energized or pilot pressurized — through the entire dwell; if the forward command drops at end of stroke, the rod can drift under load before any reversal arrives. The extended-position signal therefore does two jobs: it confirms arrival at full extension, and it starts the delay that will produce the reversal.
The position signal is either a cam on the rod tripping a small pneumatic limit valve, on an air-only machine, or a reed or proximity switch on the cylinder body, on an electrically controlled one. Both start the same delay logic, and both must trip only at the end of travel.
Two neighbouring problems are worth separating. Holding a pneumatic cylinder mid-stroke with reed switches solves balanced-flow holding between the ends of travel, and a timed hydraulic cylinder return that replaces a limit switch times the return stroke of a hydraulic ram. This article is neither: it holds a pneumatic cylinder at full extension under forward pressure and times only the reversal.
Which control method fits: reservoir, delay valve, timer, or PLC? #
Timing accuracy decides it: the meter-in-and-reservoir circuit delays in seconds but drifts with supply pressure and temperature, a dedicated time delay valve holds a documented 0.25 s to 5 s band, and an electronic timer or PLC repeats to its setting step or scan.
Read the timing column and the last column together: the tolerance you can defend decides the method. If the next station tolerates half a second of spread, the reservoir branch is the cheapest machine to build and the slowest to adjust; if the dwell is a number someone will write on a setup sheet, use the delay valve or a timer with a published repetition figure.
| Method | How it delays the reversal | Timing figure | Reset | Build it when |
|---|---|---|---|---|
| Meter-in flow control into a reservoir | Restriction slowly fills a small volume until the main valve's pilot threshold is reached | No published figure; set and verify with a stopwatch | Reservoir dumps back through the limit valve; dump time sets the shortest cycle | The machine runs on air alone and the tolerance is loose |
| Dedicated time delay valve | Calibrated delay built into a 3/2 valve; the control line starts it | 0.25 s to 5 s adjustable on the example part, per its datasheet | 50 ms pause on the example part | All-pneumatic, with a documented, adjustable dwell |
| Recycling solid-state timer | Limit switch starts the timer; its contact drives the reversal solenoid | Commonly set in 0.1 s steps; repetition per the timer datasheet | Timer resets when its input drops | Electrical adjustment from a panel, no controller |
| PLC on-delay timer | Limit input starts the timer; the done bit drives the output | Reversal lands within one scan cycle of the preset | Resets with the input | The dwell ties into machine logic, interlocks or logging |
The delay-valve row rests on manufacturer documentation: SMC's VR2110 manual describes its time delay valve as delaying operation in a general industrial pneumatic circuit, and Festo's catalog describes the VZ and VZO time delay valves as switching over once the control line has signalled and the set time has elapsed, continuously adjustable.
How do you build the all-pneumatic reservoir delay? #
Size the reservoir delay as a fill-time problem: the dwell equals the free air the reservoir must take, divided by the flow the restriction passes; a 0.2 L reservoir filling to 4 bar through a 6 L/min restriction gives the 6 s worked example below.
Build it in this order.
- Mount a cam on the rod so it trips a pneumatic limit valve exactly at full extension.
- Feed that limit valve's output through a meter-in flow control into a small reservoir, and take the reservoir line to the pilot port of the main directional valve.
- Keep the main valve's forward command applied for the whole fill; the reservoir branch only creates the reversal signal.
- When the reservoir reaches the valve's pilot threshold, the main valve shifts and the cylinder reverses.
- Let the circuit reset itself: when the rod leaves the limit valve, the reservoir dumps back through it, and that dump time sets the shortest cycle you can run.
Worked example (calculated, not measured): a 0.2 L reservoir starts at atmospheric pressure, 1.0 bar absolute, and must reach an illustrative pilot threshold of 4.0 bar absolute — take the real threshold from the pilot data of your valve. Free air to add = 0.2 L × (4.0 - 1.0) / 1.0 = 0.6 L, the pressure ratio being unitless. If the restriction passes about 6 L/min of free air at that pressure difference, fill time = 0.6 L / 6 L/min = 0.1 min = 6 s. That is a calculated example for those inputs, not a measured dwell: the flow through the restriction falls as the reservoir climbs toward the supply pressure, so a real fill runs longer than the estimate, and the honest setting comes from a stopwatch across ten cycles.
Design for two failure modes. A falling supply pressure slows the fill and stretches the dwell, and below the pilot threshold the valve never shifts at all — the cylinder sits extended with no reversal — so keep the regulated supply above the threshold with margin. Because the delay is pneumatic, it also drifts with regulator setting and air temperature, so re-check it after supply changes or a season in an unheated plant.
For a machine built the same way, cycling on air alone with no controller anywhere, the article on building a pneumatic cycle test stand without a PLC shows the circuit practice end to end.
When does a dedicated time delay valve fit better? #
A dedicated time delay valve replaces the loose reservoir-and-restriction stack with a calibrated delay in one part: Festo's VZO-3-PK-3, for example, is a 3/2 poppet valve with an adjustable delay of 0.25 s to 5 s and a 50 ms reset pause, per its datasheet.
Function choice comes first. In Festo's M5 compact family the VZ is a switch-on delay built on a normally closed 3/2 valve, and the VZO is a switch-off delay built on a normally open 3/2 valve, both monostable. For this dwell you want the switch-on behaviour: the extended-position signal arrives, the set time elapses, and the delayed output pilots the reversal. The switch-off version answers the opposite question, holding the output until a set time after the signal drops.
The figures in the first sentence come from the VZO-3-PK-3 datasheet, which also carries a repetition accuracy figure for the time setting; read that figure, with its unit, from the datasheet of the exact part before you promise a tolerance to production, because one manufacturer's number is not a universal one. SMC documents the same purpose for its VR2110 time delay valve.
In the circuit, the delay valve replaces the loose reservoir stack of the previous section: the extended-position limit valve's output feeds the delay valve's control line, the delayed output pilots the main directional valve, and the adjustment on the delay valve becomes the dwell setting. Nothing else changes.
How accurate is each timing method? #
Budget the tolerance: a 5.00 s dwell on a timer with 0.1 s steps sets to a half-step of 0.05 s, a PLC lands within one scan cycle, and the reservoir circuit needs a stopwatch campaign because its time moves with supply pressure and temperature.
Separate resolution from repetition. The half-step figure above is resolution, how finely you can set the number. Repetition is how tightly the same setting lands, cycle after cycle, and it is always a datasheet figure: read it for the timer you bought, and read the figure printed for the time setting on the delay valve's page. The reservoir circuit has no published repetition number; its figure is whatever your stopwatch campaign measures, and it will be the widest of the three.
A PLC on-delay timer counts the controller's time base, so the reversal lands within one scan cycle of the preset; small machines typically scan in single-digit milliseconds, which is noise at a seconds-class dwell. The PLC's real advantage is not accuracy but traceability: the dwell lives in the program where setup and audit can find it, not under a screwdriver-adjusted knob.
Decision input: the electronic methods repeat to a published or scanned figure, while the reservoir branch repeats only to whatever the stopwatch campaign measures — that gap, not the extra wiring, is why a tolerance-critical dwell goes electronic. The delay valve sits between them, all-pneumatic but with its repetition figure printed on the datasheet.
How do you connect a timer or PLC to the valve? #
Keep the forward solenoid command alive for the whole dwell and give the timer one job: the extended limit switch starts the timer, the timer's output closes when the setting elapses, and that output is what shifts the valve to reverse.
Two solenoid arrangements both satisfy the rule. With a single-solenoid, spring-return 5/2 valve, the forward command is coil energized, so the timer must open that coil circuit when the dwell expires: a recycling timer wired so its contact is closed through the dwell and opens when time is up, or the PLC dropping the forward output on the timer's done bit. With a double-solenoid valve, the forward coil can be held or pulsed and the valve's memory holds the position; the timer's output then energizes the reverse coil at dwell end.
In the PLC the chain is three elements: the extended limit switch is an input; an on-delay timer instruction starts when that input goes true and sets its done bit when the preset elapses; the done bit drives the output that shifts the valve. Keep the forward output true while the timer runs, and interlock the reversal against anything that must abort the cycle.
The abort is the case to think through before wiring. If a safeguard can interrupt the machine mid-dwell, dumping the valve at that moment may leave the load unsupported exactly when the guard wants it held or brought down under control; the article on stopping a vertical air cylinder on a light curtain trip works that problem for a vertical axis.
How do you commission and verify the dwell? #
Commission in this order: prove each limit switch trips only at its end of travel, prove the forward command never drops during the dwell, measure the actual dwell from limit trip to valve reversal, adjust the restriction or setting, then repeat ten cycles and read the spread.
- Trip each limit switch by hand and confirm it changes state only at its end of travel.
- Watch the forward command through one complete dwell, on the pilot gauge of the pneumatic circuit or on the output indicator or PLC bit of the electrical one, and confirm it never drops.
- Time the dwell from limit trip to valve reversal with a stopwatch for ten cycles and record the spread.
- Adjust the restriction, the delay valve setting or the timer preset until the average lands on target, then run ten more cycles and confirm the spread held.
- Re-check after any supply pressure change, and seasonally on an air-only machine, because the pneumatic branches drift and the electronic ones do not.
One safety note belongs here. The dwell is a deliberate hold of live forward pressure, so stored-energy discipline applies: before hands go into the cell, isolate the supply, exhaust the residual air and follow the plant's hazardous-energy procedure — lockout of pneumatic stored energy falls under 29 CFR 1910.147 in the US — and treat the dwell as a process function, never as a guard; the machine's risk assessment decides the safeguarding, not this dwell.
The dwell you verify on a cylinder behaves the same way one level up: a transfer station that must hold, then retract on time, fails loudly downstream when its retraction timing slips, and the walking beam dwell station retraction timing fix page treats that machine-level version of the problem.
Which method should you build? #
Build the all-pneumatic reservoir branch when the machine must run on air alone and the process accepts stopwatch-class spread, the dedicated delay valve when the dwell needs a documented adjustable band, and the timer or PLC when someone must set, trust and log the number.
Put a number on the split. If the downstream operation tolerates half a second of dwell spread, all three pass and the reservoir branch wins on simplicity, with nothing electrical to build or configure. If the tolerance is a tenth of a second, the reservoir branch is out and the choice is the delay valve against the timer, decided by whether the setting belongs on a knob or on a panel. If the dwell is a process value that appears in changeovers or audit records, it belongs in the PLC.
Whatever you build, the control rule never changes: forward pressure stays commanded through the entire dwell, only the reversal waits, and the dwell number comes from a measured stopwatch baseline, never from the fill estimate.
Questions asked
Can the cylinder dwell fully extended with no electrical parts at all?
Yes. A cam on the rod trips a pneumatic limit valve at full extension, its output fills a small reservoir through a meter-in flow control, and the reservoir's rising pressure delays the pilot signal that reverses the main directional valve until the shift threshold is reached. The forward command never drops; the reversal simply waits, and the reservoir dumps back through the limit valve on departure so the circuit is ready for the next cycle. The same branch works at the retract end too — duplicate it there if the return dwell also needs timing.
What happens if the air supply pressure drops during the dwell?
With the reservoir circuit the dwell stretches, because the restriction fills the reservoir more slowly against the lower supply; below the pilot threshold the reservoir never gets there and the cylinder stays extended with no reversal, so keep the regulated supply above the threshold with margin. An electronic timer or PLC ignores supply dips, but the solenoid valve has its own minimum operating pressure, so a sagging supply can still stall the reversal at the valve even when the timing logic fires.
How short a dwell can each method hold reliably?
The reservoir circuit gets fiddly below roughly half a second: the reservoir and restriction become tiny and the fill lands close to the pilot threshold, where small supply changes move the time a lot. An electronic timer and a PLC hold sub-second dwells cleanly, with the setting step or one scan as their floor. A dedicated delay valve also covers short dwells; take its minimum adjustable setting from the datasheet of the exact part.
Does the dwell change the force the cylinder applies?
No. The directional valve keeps full forward pressure on the working port for the whole dwell, so the holding force stays the same pressure acting on the same area that moved the load; the dwell changes only when the reversal command arrives. The dwell itself neither heats nor wears the cylinder the way a stalled motor or a slipping clutch would — the watch-out is the load, which has to tolerate sitting under full pressure.