How-to
Building a Pneumatic Cycle Test Stand Without a PLC
Short answer
Stop the test with a preset counter set to 10, not a 60-second timer: a 3 s extend plus 3 s rest gives 6 s per commanded cycle, which is a duration check, not proof of ten strokes. Wire a Start/Stop-sealed control relay to feed a 3 s on / 3 s off repeat-cycle timer driving a single-solenoid spring-return 3-way valve, and let the counter's preset contact break the run circuit.
On this page
- What parts does a pneumatic cycle test stand need?
- Why stop on a count instead of a 60-second timer?
- How do I wire start, stop, timer, and counter?
- Which valve and cylinder does the stand need?
- Should the counter count the timer or a position switch?
- How do I commission the stand safely?
- When is a PLC worth it for a test stand?
- Questions asked
You can run a ten-cycle pneumatic test stand on relays alone: no PLC, no programming gatekeeper, no combined timer/counter unit. The control side is five parts — momentary Start and Stop pushbuttons, one control relay, one repeat-cycle timer set 3 s on and 3 s off, and one preset counter with an output contact — driving a single-solenoid, spring-return 3-way valve on a single-acting cylinder. The one decision that shapes everything else is what stops the test: stop on the counter's tenth count, not on a 60-second master timer. The sections below pick the parts, wire them, choose the count point, and commission the stand.
What parts does a pneumatic cycle test stand need? #
Five control parts plus one valve: momentary Start (NO) and Stop (NC) pushbuttons, a control relay, a repeat-cycle timer, a preset counter with a relay output, and a single-solenoid spring-return 3-way valve — then the cylinder, filter-regulator, fittings, and tubing on the air side.
- Control relay. An ice-cube relay with at least two NO contacts: one seals in across the Start button, one powers the timer and counter branch. Check its contact rating against the solenoid's inrush, not just its holding current.
- Timer. A multifunction unit that includes a repeat-cycle (alternating on/off) mode. On-delay and off-delay modes are the wrong tool here: you would stack two timers to fake one alternating output. DIP-switch ranges beat an unmarked knob, because a switch position can be written on the schematic and reproduced by anyone on any shift.
- Counter. A preset counter with a relay output brought out as NO, NC, and common terminals — that contact set is what lets the tenth count break the run circuit. Confirm its reset mode (manual, electric, or automatic) before you order.
- Valve. Single-solenoid, spring-return, 3-way (3/2), coil matched to the control voltage. The "pneumatic relay" slot on a parts list like this is that valve.
- Cylinder and air prep. Single-acting, spring-return cylinder; a manual shut-off, a filter-regulator with gauge, fittings, and tubing.
What you do not need: a PLC, an HMI, a dedicated power supply when timer, counter, relay, and coil all run on line voltage — and no second master timer, because the counter replaces it.
Why stop on a count instead of a 60-second timer? #
Stop on a counter preset at 10, because 3 s of extend plus 3 s of rest is 6 s per commanded cycle and 60 s of run time only proves elapsed time — never that ten strokes happened.
The arithmetic says the test nominally takes 3 s + 3 s = 6 s per cycle and 6 s × 10 = 60 s. Treat that 60 s as a duration cross-check on a stopwatch, not a stop condition. It moves with the timer's tolerance, the relay's pickup time, the valve's switching time, which phase the repeat-cycle timer starts in, and any cycle that stalls or never completes. A master timer set to 60 s ends the test after nine good strokes just as happily as after ten, or cuts the tenth short.
The counter is deterministic: one pulse per accepted cycle, and the run circuit drops on the tenth. Two wiring rules keep it that way. Count exactly one edge per cycle — counting both the on and off transitions registers ten cycles as twenty and ends the test after five. And keep the stopwatch check: ten cycles finishing far from 60 s point to a wrong timer range, an extra count edge, or motion that never happened.
How do I wire start, stop, timer, and counter? #
Wire a Start/Stop seal-in around one control relay, feed the repeat-cycle timer from that relay's contact, and put the counter's preset contact in series with the run branch so the tenth count drops Run and de-energizes the valve.
Pick the control voltage off the nameplates first. With timer, counter, relay coil, and valve coil all at 120 VAC the stand needs no power supply at all; if the coil is 24 VDC, put the solenoid on its own fused 24 VDC branch switched by the same run contact.
- Wire the Stop (NC) button in series with the Start (NO) button and the control-relay coil.
- Bridge a NO contact of that relay across the Start button, so a momentary press seals the run state in and Stop — or the counter preset — drops it.
- Feed the timer from a second NO run contact, so the on/off pattern only runs during a test.
- Set the timer to repeat-cycle, 3.0 s ON and 3.0 s OFF; its output energizes the valve solenoid during the ON interval.
- Send one defined edge per cycle to the counter input, normally the transition that commands extend.
- Put the counter's preset output in series with the run branch, using whichever contact form opens the circuit at 10.
- Wire the reset mode you chose, and block a new Start while the completion output is still active.
- On the air side: shut-off, filter-regulator, then the valve inlet; working port to the cylinder; exhaust port open to atmosphere.
Draw the schematic with terminal numbers and record every switch position on it before ordering hardware. On a relay stand, that drawing is the maintenance manual.
Which valve and cylinder does the stand need? #
A single-solenoid, spring-return 3-way valve is the correct valve: energized, it ports regulated air to the cylinder; de-energized, it vents that port to exhaust so the spring returns the rod — the resting state on any power loss, with one coil to wire.
Bore comes from force: force is gauge pressure times bore area. Calculated example: a 1-1/2 in bore at 80 psig has π/4 × 1.5² ≈ 1.77 in² of area and produces 80 psi × 1.77 in² ≈ 141 lbf of theoretical force. A common rule of thumb — and label it as one — keeps the force the test actually needs under about half of theoretical, roughly 70 lbf here, to leave margin for friction and pressure droop. Stroke is the travel the part needs plus any approach.
Only the extend stroke consumes air; the spring returns the rod through the valve's exhaust for free. If the stand ever changes to a double-acting cylinder, the valve becomes a 5-way with both ports plumbed — the pneumatic valve setup for double-acting cylinders walkthrough covers that circuit. When you size the supply, keep actual volume versus free air displacement straight: swept volume understates what the compressor must deliver by the full pressure ratio.
Should the counter count the timer or a position switch? #
Count the timer's extend-command transition for a commanded-cycle stand, and add a position sensor only when the spec demands ten completed strokes — that is the difference between proving you commanded ten cycles and proving ten happened.
Timer-edge counting is deterministic, needs no extra sensors, and matches a sequence written as "extend 3 s, rest 3 s, repeat ten times." It cannot see a disconnected air line, a sticking spool, low supply pressure, or a cylinder that stops short — it will still count ten and report complete.
Completed-stroke counting needs a reed or Hall sensor at one repeatable end position, usually fully retracted, counting its single transition per cycle. Confirm the sensor clears during the opposite stroke so a bouncing signal cannot count twice. For the sequence as specified, count the timer edge and verify motion during commissioning; specify the sensor the day the acceptance test says "ten completed strokes."
How do I commission the stand safely? #
Dry-run on a temporary preset of 3 with the air isolated, confirm Stop drops Run instantly and the third count ends the test by itself, then restore the preset to 10 and run ten timed cycles with air at the approved setting.
- Lock out the electrical supply and isolate the air while wiring. With the valve de-energized, confirm the cylinder sits retracted: that proves the spring return is the resting state.
- Record the timer settings (mode, range, 3.0 s / 3.0 s) and the counter setup (preset 10, count edge, reset mode) on the schematic.
- Set the counter temporarily to 3 and press Start once: the relay seals in, Stop drops it instantly, and the third count ends the test on its own.
- Watch the counter through the dry run: one increment per cycle, nothing during reset, nothing when the valve was never commanded.
- Restore the preset to 10, apply air at the approved pressure, and time the test with a stopwatch: expect 6.0 s per cycle and about 60 s for ten.
Wire the control panel to NFPA 79 — a disconnecting means, overcurrent protection, and grounding — guard the pinch area per the machine's risk assessment, and treat the air supply as stored energy under your lockout procedure, in line with ISO 4414 practice for pneumatic systems. Make timer and counter settings with the panel door closed; where a setting needs the door open, follow the site's energized-work rules.
When is a PLC worth it for a test stand? #
Choose the PLC only when the sequence will keep changing; for a fixed ten-cycle, 3 s on / 3 s off stand, relays win — visible settings, faults you can find with a meter, single parts you can swap, and no one becomes the keeper of the program.
| Control scheme | What it gives you | What it costs you |
|---|---|---|
| Relay, repeat-cycle timer, preset counter | Settings visible on the devices, meter-level troubleshooting, single-part replacement | Rewiring for logic changes; settings behind the panel door |
| PLC, no display | Timers, counters, and sequence in one controller; changes become edits | Programming software, a connection, and a program owner |
| PLC with display | Start/Stop and a running cycle total on screen, room to grow | Two more devices to configure, power, and support |
The relay stand's advantage in production is exactly what you were after: nobody waits on a programmer to change a fuse or re-set a timer. If the requirements outgrow a fixed count and fixed intervals, the same stop-at-the-count pattern becomes a standard timer-and-counter ladder logic rung, and moving it to a controller then costs little redesign.
Questions asked
How do I reset the counter for the next part?
Wire the reset into the Start path so one press resets and then runs, or use a manual reset pushbutton — but block Start while the completion output is still active, or the stand restarts mid-indication. Choose a counter whose reset mode is documented as manual or electric and wire that mode deliberately; a counter that auto-resets on the next input pulse can hide a missed count.
How much compressed air does one ten-cycle test use?
Calculated example, not a measurement: a 1-1/2 in bore, 4 in stroke single-acting cylinder at 80 psig sweeps π/4 × 1.5² × 4 ≈ 7.07 in³ per extend stroke. The free-air ratio at 80 psig is (80 + 14.7) ÷ 14.7 ≈ 6.44, so each stroke draws about 45.5 in³ of free air, and ten strokes ≈ 455 in³, or roughly 0.26 scf. The return stroke uses nothing; the spring does that work.
Can I run the controls on 24 VDC instead of 120 VAC?
Yes — pick one voltage and match the timer, counter, relay coil, valve coil, and any indicator lamps to it. An all-120 VAC scheme needs no power supply when the valve coil is 120 VAC too. If you prefer a low-voltage control side, add a fused 24 VDC supply and switch the solenoid through its own contact; the logic does not change, only the supply and the contact ratings.
Does the stand need a filter-regulator or just a regulator?
Use a filter-regulator with a gauge upstream of the valve. The regulator sets pressure, which sets cylinder force and test severity; the filter keeps water and pipe scale off the valve seat and the cylinder seals, which is what keeps the count meaningful over months of cycling. Set it, lock it, and record the setting on the test sheet so every part sees the same force.