AutomateDirectUSAMotion LibraryIndustrial monitors & PCs

Troubleshooting

What to check after a blown servo amplifier

Servo and stepper motion Published 7 min read By AutomateDirectUSA engineering team

Short answer

A blown servo amplifier usually has a cause that survives the failure: an axis cable or motor winding leaking to ground, or a brake locked against commanded motion. Before installing the replacement, insulation-test the cable and the motor separately at 500 V DC and require better than the IEEE 43 floor of rated kilovolts plus 1 megohm, free the brake with the axis supported, and wait the drive's documented bus-discharge time.

On this page
  1. What kills an amplifier, and what the alarm does not tell you
  2. Discharge and support before you open anything
  3. The checks, cheapest first
  4. Worked example: a 230 V Z-axis motor tested at 500 V DC
  5. Clearing the brake
  6. Before the replacement powers up
  7. Questions asked

Do not install the replacement amplifier and power up: the fault that destroyed the old one is usually still in the circuit. Behind a blown servo amplifier, two causes account for most repeat failures — an axis power cable or motor winding that has gone to ground, and a vertical-axis brake that locks instead of releasing. Either one will destroy the new drive on its first move. The deciding measurement is insulation resistance to ground in megohms, taken on the cable and the motor separately with an insulation tester; a continuity or winding-resistance reading cannot clear the circuit, because insulation that holds at a meter's few volts can break down at operating voltage. Work through the checks below in order and reconnect only when every one of them passes.

What kills an amplifier, and what the alarm does not tell you #

A servo amplifier's output stage switches bus voltage into the motor windings many thousands of times a second. A conductor that has grounded, or a winding fault to the frame, hands that bus a low-resistance path to earth through the output devices. Their protection reacts quickly, but a hard fault releases more energy than the semiconductors survive. That is the bang, the cooked board and the indicator LEDs that never light again.

The second path is slower. A brake that stays locked while the control commands motion stalls the motor against it: current climbs, and losses in the windings and output devices rise with the square of the current (P = I²R). The amplifier cooks over seconds or minutes instead of failing in one bang. A binding ball screw or guide does the same, so a brake fault and a mechanical bind get separated by the same observation — high axis current with a clean insulation test.

Alarm 163 on this machine's control is a symptom, not a diagnosis. Read its full text in the control's own documentation and preserve the alarm history before clearing anything. Neither the alarm nor the bang identifies the part that started it; the amplifier is frequently the component that sacrificed itself. The two patterns that recur behind a fried axis amplifier are a cable grounded at a moving flex section and an earlier brake design that locks up — both get cleared before the replacement is installed.

Discharge and support before you open anything #

Isolate and lock out the machine supply, and block the Z axis against gravity before disconnecting the motor or brake: with the amplifier out of circuit the motor produces no torque, and the brake may be the only thing holding the axis up. The drive's bus capacitors hold a lethal charge after the supply goes off — wait the discharge interval in the drive's service documentation and measure the residual voltage at the designated points before touching power terminals. One 15 kW, 400 V drive family documents 760 seconds, about 13 minutes, so the wait runs in minutes and ends at a meter reading, not at a clock.

The checks, cheapest first #

  1. Bus discharge verified. After the documented wait, measure the bus at the drive's designated points and confirm it reads near zero before any terminal is touched. This costs nothing but time and clears the shock hazard.
  2. Cabinet and cable inspection. Look for arc marks and burned insulation at the amplifier's power terminals, abrasion or crushing along the cable's flex section and strain reliefs, and coolant or oil on connectors. A scorch trail from the cable to the amplifier convicts the cable outright.
  3. Continuity and short checks. With the motor disconnected at both ends, check each power conductor for opens and for shorts between conductors. Flex the cable through its full travel while watching the meter: a reading that appears and disappears in one position is a fault in the moving flex section, which is the most common one.
  4. Insulation resistance, cable and motor separately, at 500 V DC. Disconnect both ends and lift the brake and feedback leads so the tester never reaches the amplifier or the encoder. The acceptance floor comes from IEEE 43, and the worked example below turns it into a number. A reading at or below the floor fails, and the two separate measurements say which part pays for the repair.
  5. Winding resistance balance. Measure phase-to-phase resistance at the motor terminals and compare the three readings with each other and with the motor documentation. A small spread — a few percent is the rule of thumb — is expected, and a turn-to-turn short that hides from the insulation test often shows up as an unbalanced reading.
  6. Brake release check. With the axis blocked, command a release, measure the release supply at the brake connector, then confirm the shaft actually turns freely. The full procedure is in the brake section below.

Repair whatever fails — a new cable, a dried or rewound motor, brake hardware — before the amplifier is installed. If the insulation test passes but the axis still misbehaves once it runs, the further motor tests in how to tell if a servo motor is actually faulty take the diagnosis the rest of the way.

Worked example: a 230 V Z-axis motor tested at 500 V DC #

Inputs. The motor on the failed Z axis is rated 230 V AC, read from its nameplate; this is an example case, not a record from a particular machine. The test voltage is 500 V DC, the setting IEEE 43 pairs with windings rated below 1,000 V; the test-instrument maker's application guidance is the same for routine checks and adds 1 kV as a troubleshooting setting that can expose insulation which is weak but not yet failed. The example readings: the cable, tested alone, measures 2 GΩ to ground; the motor, tested alone at about 25 °C, measures 0.8 MΩ.

Rule. IEEE 43 sets the acceptance floor: for most machine windings built after about 1970, the insulation resistance corrected to 40 °C must be at least the machine's rated voltage in kilovolts plus 1 megohm.

Arithmetic. Floor: 0.23 kV + 1 MΩ = 1.23 MΩ. Temperature: insulation resistance roughly halves for every 10 °C of rise, as a rule of thumb. The reading sits 15 °C below the 40 °C reference, so 0.8 MΩ divided by 2 gives 0.4 MΩ at 35 °C, and 0.4 MΩ divided by 1.41 gives about 0.28 MΩ corrected to 40 °C.

Result. Corrected to 40 °C, the motor reads about 0.28 MΩ against a floor of 1.23 MΩ: the winding fails. The cable's 2 GΩ clears it with more than three orders of magnitude to spare.

Decision. This motor does not go back on the axis. Dry or bake the winding by the motor maker's method, retest with the same one-minute reading interval, and reconnect only when it clears the floor with margin — hundreds of megohms is what a dry winding looks like. If it still reads low when dry, the motor is rewound or replaced. In this example the test splits the suspects: the motor convicts itself and the cable goes back on.

Clearing the brake #

The motor label and the machine's wiring documentation first say whether this axis motor even carries a brake. If it does, block the axis, command a release and measure the release supply at the brake connector; then confirm mechanically, by the machine's approved service method, that the shaft turns freely — a command on the control is not proof the brake has physically released. A burned-out coil or a binding mechanism leaves the brake applied while the control believes otherwise, and that is the slow path that cooked the drive in the second failure pattern. Repair the brake hardware before the replacement goes in. What the holding brake is for, and what it is not for, is laid out in what a servo motor holding brake does and does not do.

Before the replacement powers up #

Select the replacement from the machine and control maker's compatibility documentation. The failed unit's label in this case reads 45 A, and that output rating alone does not establish interchangeability — the four checks that match a servo drive to a motor cover what does. Inspect the supply side of the failed amplifier: protective devices that operated during the fault, damaged or loose terminations, grounding, and adjacent wiring scarred by the bang. Find out why a fuse operated instead of only replacing it.

Keep the alarm history, then restart in stages: jog the axis at low speed and watch the axis current against what the mechanics normally demand before resuming the interrupted program. If a feedback alarm appears on the new drive, isolate wiring, encoder and drive before condemning parts — a feedback error is sometimes the cable's fault, as covered in isolating a servo encoder phase alarm between wiring, encoder and drive.

Questions asked

Can I just install the same amplifier and see if it works?

You can, and it will usually fail again. The amplifier is rarely the origin of the fault: a cable or winding that has gone to ground, or a brake locked against commanded motion, is still in the circuit and will push the same destructive current through the new unit on its first move. Clear the cause with the insulation test and the brake check first; then the replacement has a fair chance of lasting.

Is a multimeter insulation check good enough?

A multimeter finds a hard short to ground or an open conductor, and it remains the right tool for winding-resistance balance. But its few volts cannot expose insulation that holds at low voltage and breaks down near operating voltage, so a normal ohm reading does not clear the motor circuit. Use an insulation tester, take the reading after one minute, which is the usual convention, and record it so later retests compare like with like.

How long do I have to wait before touching the amplifier terminals?

Wait the interval in the service documentation of the exact drive, then verify with a meter at the drive's designated measurement points; do not trust a fixed guess. The figures are model-specific: one 15 kW, 400 V drive family documents 760 seconds, about 13 minutes, before its bus is guaranteed discharged. Smaller drives finish sooner, but the meter, not the clock, has the final word.

Does this apply when the machine has no axis brake?

Skip the brake check and everything else stands. A horizontal axis, or a vertical axis held by a counterweight instead of a motor brake, removes the locked-brake failure path. The grounded-cable path is the more common one and does not care about axis orientation, so run the inspection, the continuity checks and the insulation test on the cable and motor exactly as written before connecting the replacement.

What should a healthy servo motor read on the insulation test?

Far above the acceptance floor: a dry, healthy winding typically reads hundreds of megohms to gigaohms, orders of magnitude over the kV-plus-1 megohm minimum. A single-digit megohm reading just above the floor passes the standard but points to moisture or contamination, so dry the winding by the motor maker's method and retest before reconnecting. A falling trend across repeated tests matters more than any one number.

Keep reading

  • Selection guide

    Matching a servo drive to a motor: four checks before you buy

    A servo drive fits a motor when four checks pass: supply and bus voltage against the motor's back-EMF and insulation, continuous and peak output current against the nameplate values converted to one basis, the drive's feedback input against the exact encoder type, and the command interface against your controller. Work through them in order, then get a written sizing confirmation from the drive maker before you order.

    Servo and stepper motion

  • Explainer

    Replacing Drives on Old DC Servo Motors Without Sizing Errors

    Keep old permanent-magnet DC servo motors once the tag arithmetic and a meter agree: back EMF at top speed plus armature drop sets the terminal voltage, and one ambiguous resistance digit moves the required DC bus by tens of volts. Measure the winding four-wire and the supply with a voltmeter, then buy the drive those two readings name.

    Servo and stepper motion

  • Explainer

    Servo motor service life: what sets it and what shortens it

    A servo motor on a normal duty cycle lasts 10 years or more. The limit is almost never the windings or magnets: it is bearing fatigue, which falls with the cube of radial load and in proportion to speed, and grease and insulation ageing from heat, which roughly halves for every 10 K of sustained temperature rise. Keep it cool, keep the load within the continuous rating, and renew the bearings on schedule.

    Servo and stepper motion