AutomateDirectUSAMotion LibraryShop the parts catalog

Selection guide

Choosing Servo or Stepper to Replace a VFFS Main Drive Motor

Motors, gearboxes and drives sizing Published 8 min read

Short answer

A 550 W, 1400 rpm main motor implies about 3.75 N·m of rated shaft torque, and stepper torque falls to a fraction of its holding value well before that speed. Use a 750 W-class servo, about 5.1 N·m at 1400 rpm, when you must control timing within each revolution; a stepper only fits at roughly one-third cycle speed. Size the replacement from measured RMS and peak torque, not from the wattage.

On this page
  1. What the nameplate fixes, and what it does not
  2. Why a stepper cannot deliver 3.75 N·m at 1400 rpm
  3. Match the architecture to the control you need
  4. Size from measured duty before you order
  5. Swap the motor without losing cam timing
  6. The decision, case by case
  7. Questions asked

Replace the motor with a servo in the 750 W class and its matched drive; do not use a stepper at full speed. The 550 W, 1400 rpm nameplate implies about 3.75 N·m of rated shaft torque, and stepper torque falls to a fraction of its holding value well before 1400 rpm. A 750 W servo holds about 5.1 N·m at that speed, which is the headroom the cam peaks need. A stepper stays on the table only if you accept roughly one-third of the current cycle speed. Here is the arithmetic, the architecture choice, and the measurements to close before you order hardware.

What the nameplate fixes, and what it does not #

Rated shaft torque follows from power and speed:

T = 9550 × P(kW) / n(rpm)

For this plate, T = 9550 × 0.55 / 1400 = 3.75 N·m. That is the torque any 550 W machine delivers at its 1400 rpm rated point — a calculated estimate from the nameplate, not a measurement of what the cams demand. The motor turns a right-angle gearbox into a vertical camshaft, so the shaft side sees motor torque × ratio × efficiency; read the ratio and efficiency off the gearbox plate before comparing anything downstream. Cam lift, spring compression and dwell transitions push the instantaneous peak above that average, which is why the replacement gets sized from a measured duty cycle below.

The electrical fields cross-check each other. Do not convert input current into output power: if 4.0 A is single-phase at 220 V, apparent power is 220 × 4.0 / 1000 = 0.88 kVA, and 0.55 kW mechanical out of 0.88 kVA implies a combined power factor and efficiency of 0.55 / 0.88 ≈ 0.63 — plausible for a small machine motor, so the power and current readings agree. If the plate says three-phase, the same current gives √3 × 220 × 4.0 / 1000 = 1.52 kVA. Read the phase marking off the plate; it also decides the VFD route later.

And the hand test: a shaft that spins freely proves the mechanism is not seized, nothing more. Running torque, acceleration torque and reflected inertia do not exist at zero speed.

Why a stepper cannot deliver 3.75 N·m at 1400 rpm #

Holding torque is a zero-speed number. As step rate rises, a stepper's available torque falls steeply — the curve on any manufacturer's datasheet drops to a small fraction of holding torque within the low thousands of rpm. A widely used rule of thumb for a size-23 motor with about 1 mH winding inductance is 25 to 40 percent of holding torque at 1000 rpm, and less above that.

Run the check with an illustrative 3.0 N·m holding torque, a large motor in that frame class — a worked example, not a catalog rating:

  • At 1000 rpm: 3.0 × 0.25 = 0.75 N·m, or 3.0 × 0.40 = 1.2 N·m.
  • The drive needs 3.75 N·m at 1400 rpm, further down the curve than either number.

Even the optimistic 1000 rpm figure covers about a third of the requirement. To deliver 3.75 N·m at 1000 rpm at the 25 percent point, a stepper would need 3.75 / 0.25 = 15 N·m of holding torque — not a practical frame for this machine. At full speed the verdict is not close.

Two stepper traits make it worse on a cam machine. An open-loop stepper that stalls loses position without reporting it, so a marginal fit shows up as crashed timing rather than a fault code. And the limit is physics — winding inductance — so bolting on an encoder does not move the curve; feedback detects and corrects, it does not add torque.

The one stepper path: cut cycle speed to about a third, near 470 rpm at the camshaft, where the motor still delivers most of its torque. Whether that closes depends on the measured machine torque against the manufacturer's torque-speed curve at your drive voltage — a maybe that costs two-thirds of your production rate. The same speed-versus-torque trade-off decides servo or stepper for fast start-stop feed rollers.

Match the architecture to the control you need #

Control you need Architecture that delivers it Where it stops
Change overall cycle speed; cams set the in-cycle motion Three-phase induction motor with a VFD No shaft-position control; open-loop speed sags under load
Stop at a repeatable position, loose tolerance Induction motor with VFD, encoder or placed sensors, dynamic braking Stop accuracy moves with load and deceleration settings
Control speed, position or timing within each revolution at 1400 rpm Servo motor with its matched drive and encoder feedback Needs tuning plus peak-torque and regeneration checks
Index slowly, torque well inside the published curve Stepper motor and drive Torque falls with speed; missed steps go unreported in open loop

Your goal — timing control during the cycle — is the third row: a servo. At 750 W the ideal rated torque is 9550 × 0.75 / 1400 = 5.1 N·m, about 1.36 times the implied demand, which is the margin the cam peaks consume. That arithmetic qualifies a power class, not a specific motor: before ordering, confirm the candidate's published continuous torque at 1400 rpm, its peak torque and how long it may hold it, its rated speed, and what supply the drive needs.

If you only want overall speed changes, the first row is the honest answer and it can keep the existing motor — unless the nameplate says single-phase, because a VFD in this power class outputs three-phase and the motor changes with it.

Size from measured duty before you order #

This machine came with little documentation, and the same measure-first path applies when sizing a conveyor motor drive without a design manual.

  1. Photograph both plates. Record phase, frequency, voltage, current, power, rated speed, duty rating, gearbox ratio, shaft diameter, mounting face and rotation direction.
  2. Mark the camshaft and confirm whether one revolution equals one machine cycle. Record minimum, normal and maximum cycle speed.
  3. Measure running speed with a tachometer. If a VFD already drives the motor, record its output frequency and current through a complete cycle.
  4. Capture torque or current against shaft angle over whole cycles with product running: startup, cam lift, spring compression, sealing, stop. A temporary encoder or a marked angle reference makes each peak traceable to a mechanism.
  5. Compute the cycle RMS torque, T_rms = sqrt((T1²·t1 + T2²·t2 + ...) / (t1 + t2 + ...)); the servo's continuous rating must exceed it.
  6. Take peak torque as the worst instantaneous sum of load and acceleration, T = J·α, with J in kg·m² and α in rad/s².
  7. Reflect the load inertia through the gearbox by the square of the speed ratio: a 10:1 box divides what the motor sees by 100. For the motor's own limit, calculating maximum load inertia by torque-speed analysis walks the check against the published curve.
  8. Check maximum speed at the motor shaft, not just the camshaft, and confirm the belt, pulleys, bearings and gearbox are rated for the new profile.
  9. Add braking resistors or other regeneration handling only if the drive manual and your measured deceleration energy call for it.

Swap the motor without losing cam timing #

Lock out the machine and release stored energy before pulling the belt: the follower springs hold the mechanism loaded with the motor off, and an unguarded belt and pulley are a running nip point. Follow the stored-energy control steps of your lockout procedure (in US practice, OSHA 1910.147) and the machine's risk assessment.

  • Before removing anything, mark the camshaft position and the belt, pulley and gearbox references, and photograph them.
  • Keep the cam relationships unless you are redesigning the control. A servo can reshape speed within a revolution, but abrupt profile changes raise peak torque, work the gearbox backlash and increase regenerated energy on deceleration.
  • A shaft that matches the old 15 mm diameter does not by itself prove the key, overhung load, belt tension or mounting face are right; if the new shaft differs, you are re-specifying the timing pulley that carries the 23 mm belt.
  • Configure the motor and feedback exactly as the matched drive's manual requires, and verify rotation direction at low torque with the mechanism uncoupled where the design allows.
  • Establish a repeatable home from the encoder index or a machine sensor, and record the relationship between home, cam angle and the safe stopped position.
  • Start with conservative acceleration, deceleration, speed and torque limits; jog one full cycle watching for interference; raise speed in stages; fix backlash, loose couplings and belt tension before touching the tuning gains.

The decision, case by case #

  • You must control timing within each revolution at full speed: buy a 750 W-class servo with its matched drive and encoder feedback. It is the only row of the table that does this job, and it clears the nameplate demand with about a third of headroom.
  • You only need to change overall cycle speed: a three-phase induction motor with a VFD, replacing the motor too if the plate shows single-phase. The cams keep the in-cycle motion.
  • You need a repeatable stop with moderate tolerance: VFD plus encoder or placed sensors and dynamic braking, accepting that accuracy moves with load.
  • A stepper is acceptable only at about one-third cycle speed — near 470 rpm — and only after the measured torque fits the manufacturer's torque-speed curve at your drive voltage. At 1400 rpm the answer is no.
  • Whatever you choose, the gearbox output torque changes with the new motor's torque: re-check the belt drive and the driven mechanics against the new peak.

Questions asked

Why does stepper torque fall as speed rises?

Current in a stepper winding must reverse every two steps, and winding inductance limits how fast it can build. As step frequency rises, the current never reaches full value, so available torque drops steeply. Compare the manufacturer's torque-speed curve at your drive voltage, not the holding-torque headline, and evaluate your worst case at your maximum speed, not at the low-speed end of the chart.

The old motor turns freely by hand. Is the torque requirement low?

No. Hand rotation only proves the mechanism is not seized. The torque that sizes the drive is mostly dynamic: accelerating the cams, springs and gearbox inertia every cycle and compressing the follower springs, and those loads appear only at running speed. Capture current or torque against shaft angle through full cycles with product running, then size from the RMS and peak values.

Can I keep the existing motor and add a VFD?

Only if you need overall speed control rather than control within each revolution, because the cams keep setting the in-cycle motion. Check the nameplate phase first: a VFD in this power class outputs three-phase, so a single-phase motor has to be replaced with a three-phase motor of similar power. Add an encoder or placed sensors and braking if you need a repeatable stop within a loose tolerance.

Is a 750 W servo always enough for this machine?

No, and gearing is the main way the answer changes. If you insert a belt or gearbox reduction between the servo and the camshaft, the motor sees torque divided by the ratio but speed multiplied by it, so at a 2:1 reduction a 750 W servo at 2800 rpm must supply only about 2.55 N·m — check that 2800 rpm is still inside its rated speed range. Without gearing, confirm continuous torque above your cycle RMS torque, peak torque above your worst instantaneous demand, and rated speed above your maximum motor speed before ordering.

How do I sanity-check a nameplate that looks wrong?

Cross-check the electrical fields against the mechanical rating. A plate that seems to read 40 A at 220 V implies 8.8 kVA of apparent power, which contradicts a 550 W output; re-read and photograph the whole plate, since 4.0 A single-phase at 220 V gives 0.88 kVA, which is consistent. Record phase, frequency, connection and rated speed before doing any sizing arithmetic.

Keep reading

  • How-to

    Stepper Motor Torque at Speed for a Web Tension Roller

    A 10 lbf web on a 3 in driven roller needs 240 oz-in of steady torque at about 255 RPM. A NEMA 34 curve that shows 100 oz-in there covers only 42% of the tension load, so read torque-speed curves at the operating speed — never the holding-torque rating — and either add reduction or move to a geared servo for a continuous tension zone.

    Motors, gearboxes and drives sizing

  • Selection guide

    Stepper to Servo Conversion: When It Is Worth Retrofitting

    A stepper-to-servo conversion is feasible but it is an axis-engineering project, not a drive-card swap: sizing, mechanics, feedback, power, command interface and safety all change. If the machine already meets its speeds, repairing the stepper electronics or fitting closed-loop steppers carries less risk; convert when you need speed, acceleration or provable position the steppers cannot deliver.

    Motors, gearboxes and drives sizing

  • Comparison

    Stepper vs Servo Torque for Robot Joints: What Actually Decides

    The motor that wins a robot joint is the one with torque available at the joint's required speed, held through the real duty cycle. A stepper's holding torque and a geared servo's stall torque describe standstill; compare the stepper's torque-speed curve at the motor speed your move demands against the servo's continuous rating. The worked elbow example shows the arithmetic and the thresholds.

    Motors, gearboxes and drives sizing