What an ATEX Zone 1 electro-hydraulic actuator must prove
Short answer
Accept an ATEX Zone 1 electro-hydraulic actuator only with an assembly-level Category 2 G certificate, loaded force-versus-speed data across the stroke, and documented thermal and endurance capability for continuous modulating service. For 100 kN through an 8 in (203.2 mm) stroke in 10 s, average speed is 0.8 in/s and ideal load-side power 2.032 kW; electrical input runs higher.

On this page
- Start from the duty profile, not the thrust rating
- The arithmetic you are actually buying
- Certification: Category 2 on the complete assembly
- Architecture options compared
- Continuous modulation, heat and life
- Accuracy, response and the failure state
- Acceptance tests and the selection decision
- Questions asked
A self-contained electro-hydraulic actuator is the right architecture for a gas-turbine inlet guide vane positioner in Zone 1, and certified units for exactly this duty exist. Accept a candidate only when it proves three things: a hazardous-area certificate covering the complete supplied assembly as Category 2 G equipment, force-versus-speed data showing the required transit time with full load attached, and documented thermal and endurance capability for continuous modulating service at the turbine-deck ambient. A thrust figure and a stroke figure prove none of the three. The worked example below turns the stated duty into the numbers an acceptance test has to check.
Start from the duty profile, not the thrust rating #
Every acceptance check later hangs on one row of this table, so confirm each input from plant documents before anything goes to a supplier: whether the force is needed in both directions and at every point in the stroke, and whether the transit time applies to full stroke or to controlled travel only. The reason for the change belongs in the specification too: the installed pneumatic positioner missed the transit-time and accuracy requirements, so the replacement is bought against those two duties, not against a force rating.
| Duty input | Your value | What the actuator must prove |
|---|---|---|
| Hazardous area | Zone 1 | Assembly-level certificate marked Group II, Category 2, G, EPL Gb |
| Controlled travel | 8 in (203.2 mm) | Usable stroke across all of it, position feedback over the whole travel |
| Force | 100 kN | Rated force in both directions at any point in the stroke |
| Transit time | 10 s | Loaded speed across the stroke, timed with the force applied |
| Service | Continuous modulation | Thermal and endurance data for that duty at the installed ambient |
| Application | Gas-turbine IGV positioning | Stated accuracy, step response and a defined failure state |
Two inputs come from the plant, not from any actuator datasheet: the gas group and temperature class of the Zone 1 area, which its hazardous-area classification fixes, and the positioning accuracy the vane control actually needs, which the turbine vendor's control specification states.
The arithmetic you are actually buying #
Average speed and average power set the floor; the pump has to clear the peaks. For the stated duty, 100 kN through 0.2032 m in 10 s:
- Average speed: 0.2032 m ÷ 10 s = 0.02032 m/s, that is 20.3 mm/s or about 0.8 in/s.
- Average load-side power, assuming full force through the whole stroke at constant speed: 100,000 N × 0.2032 m ÷ 10 s = 2,032 W, so 2.032 kW.
These are calculated values for those inputs, not measured results or electrical ratings. Three corrections move the real numbers up, and each one is supplier data:
- Acceleration: the actuator reaches travel speed while pressure is still building, so peak flow and peak power exceed the average.
- Pump flow: with an illustrative 80 mm bore at 210 bar (21 MPa), available force is 0.005027 m² × 21 MPa = 105.6 kN, which clears the duty, and average flow is 0.005027 m² × 0.02032 m/s ≈ 6.1 L/min; the pump and valve must deliver the peak, not the average.
- Electrical input: divide by the overall efficiency the supplier documents — at an illustrative 0.7 overall, 2.032 kW ÷ 0.7 ≈ 2.9 kW before any acceleration margin.
Ask for the loaded force-versus-speed curve across the whole stroke. A transit time timed on a no-load bench is the figure that fails on the turbine deck.
Certification: Category 2 on the complete assembly #
Directive 2014/34/EU puts Zone 1 in equipment Category 2, and Category 2 electrical equipment needs an EU-type examination certificate issued by a notified body; ask for the certificate number and match it to the nameplate. The nameplate should read Group II, Category 2, then the protection methods with gas group and temperature class, ending in the EPL Gb — that is the Zone 1 signature. A unit marked Category 3 with EPL Gc is a Zone 2 machine, and careful installation does not close that gap. The IEC 60079 series defines the protection methods behind the Ex codes, and every field decodes the same way on electrical and pneumatic equipment: the field-by-field reading of an Ex h IIB T4 Gb marking on a pneumatic actuator shows the pattern.
Certified hardware for this exact duty exists. Woodward's documentation for the TM-25LP and TM-200LP electro-hydraulic actuator families states certification for Zone 1 as Category 2 equipment, with a Zone 2 Category 3 listing as well, and requires field wiring to follow the wiring methods that same documentation sets out. Certificate and wiring rules in one document is the pattern to demand from any candidate. The same manufacturer documents an intrinsically safe ATEX and IECEx certified actuator built to position inlet guide vanes on industrial gas turbines, so the application class itself is served.
Scope decides the argument. The certificate has to cover the assembly as supplied: drive motor, junction box and terminals, position feedback, solenoid or pilot valves, pressure switches, any heater. A certificate on the motor alone leaves the feedback device and the valves outside the proof, and fitting an uncertified switch into a certified enclosure takes the assembly outside its approved design. Wiring is part of the approval: the gland types, cable segregation and screen earthing the documentation permits are conditions of the certificate, not suggestions.
Architecture options compared #
Four architectures can meet the duty; three can be bought, and the fourth is the reason you are in the market. The self-contained electro-hydraulic unit carries motor, pump, reservoir, control valve and cylinder as one package, which concentrates the certification argument in one document set. A servo valve tied into the turbine's existing hydraulic system avoids a second power unit but spreads the proof across valve, transducers, cabling and work on a live system, and the integration cost concentrates there. All-electric roller-screw actuators deserve evaluation on documents rather than reputation, against the same evidence list as the hydraulic unit: temperature limits, continuous-modulation capability, positioning accuracy, mechanical life, failure behavior and hazardous-area certification.
| Architecture | Zone 1 proof it needs | Verdict for this duty |
|---|---|---|
| Self-contained electro-hydraulic | One assembly-level Category 2 certificate covering motor, feedback and valves | First choice when loaded speed and thermal data hold |
| Servo tie-in to the turbine hydraulic system | Every added valve, transducer and cable certified; system integration work | Fallback when no packaged unit passes the duty tests |
| All-electric roller-screw | Certified electronics plus continuous-duty thermal and life data | Keep in the comparison only with the same evidence |
| Pneumatic positioner | None; it is the installed baseline | The unit that missed the transit time and accuracy |
Continuous modulation, heat and life #
Continuous modulating service is the test most datasheets dodge. The pump runs nearly continuously against the control valve, the reservoir is small by design, and the ambient beside a turbine casing stays high for hours. Demand four numbers in the specification: the maximum ambient for continuous modulating duty, the tested endurance in cycles or hours of modulating service, the oil temperature the unit holds at that duty, and the rated life of the position feedback. Evidence quoted only for intermittent or on-off duty is the wrong evidence for this service. Elevated ambient also erodes the temperature-class margin, so read the T-class together with the ambient the certificate assumes.
Accuracy, response and the failure state #
Accuracy and step response go into the specification as numbers from the turbine vendor's control requirements, and they are verified on the machine at acceptance. Position-loop gains set on a supplier's bench rarely transfer unchanged, because velocity gain that sets loop stiffness differs from axis to axis; budget tuning time on the installed unit and hold the supplier to a documented step response at its own settings as the starting point.
The failure state is a safety decision, not an actuator feature. The turbine OEM's hazard analysis decides whether the vanes must drive to a defined position, hold where they are, or move to a safe position on power loss; the actuator then has to prove the hardware for it — spring return, accumulator backup, or certified pilot valves with hydraulic lock — and the time the move takes. How the safe state is reached, by stopping the pump or by de-energizing solenoids, is its own design decision on a hydraulic power unit. One rule sits above the rest: do not add failure hardware or rewire inside the certified enclosure in any way the assembly documentation does not permit, because that voids the certification the whole selection rests on.
Acceptance tests and the selection decision #
Acceptance is a five-item test, run in this order:
- Documents: assembly-level EU-type examination certificate with Category 2 G marking matching the plant's gas group and temperature class, the IECEx certificate where the plant uses that scheme, and the wiring instructions.
- Loaded stroke test: full stroke under the process load in both directions, timed against the transit-time requirement.
- Step response: accuracy and overshoot at the supplier's documented settings, at the resolution the vane control needs.
- Thermal run: continuous modulating duty at plant ambient until temperatures stabilize, checked against the rated ambient and oil temperature.
- Failure test: remove electrical power and time the move to the defined failure position.
The decision follows from the five checks. Select the self-contained electro-hydraulic unit that passes all of them. If none does, put the servo tie-in to the turbine's hydraulic system through the same five checks, with every added component individually certified. Keep an all-electric screw actuator in the running only when a supplier hands over the identical evidence package. Certified families for exactly this duty are documented, so a candidate that cannot produce an assembly-level Category 2 certificate drops out before the test bench.
Questions asked
Why will a Category 3 actuator not serve Zone 1?
Category 3 equipment is protected against the faults expected in normal operation, which is the Zone 2 level of protection. Zone 1 requires Category 2, which must stay safe even with one fault on top of normal operation. A unit marked II 3G or EPL Gc cannot be upgraded by installation practice; the nameplate must read Category 2 and EPL Gb before any of the duty tests matter.
How do you check that a certificate really covers the whole package?
Read the certificate's scope, not just the marking. The certificate names the manufacturer and lists the covered equipment, usually with annexes; every electrical element in the supplied assembly, including motor, junction box, position feedback, solenoid valves and switches, must appear there or hold its own certificate that the assembly documentation references. A scope that names only the motor leaves the feedback and the valves unproven for Zone 1.
What sets the gas group and temperature class to specify?
The plant's hazardous-area classification sets both. The gas group follows the fuel or process gas, and natural gas, mostly methane, sits in group IIA; the temperature class follows the maximum surface temperature the classification permits at the turbine deck. The actuator marking must meet or exceed both, and the certificate's rated ambient must match the installed location, because a hot deck erodes the margin.
Who decides the actuator's failure position?
The turbine OEM's safety analysis, recorded in the machine's risk assessment. Ask whether the guide vanes must drive to a defined position, hold in place, or move to a safe position when electrical power is lost, and how fast. Then require the hardware that achieves it, such as spring return, an accumulator or certified pilot valves with hydraulic lock, and time the move during the failure test at acceptance.