Short answer

Size a DC servo power supply from the nameplate's rated armature voltage and continuous current, never from the pulse amps or a software speed limit. A single-phase full-wave capacitor-input rectifier charges the bus to about RMS times 1.414, so a 1:1 120 VAC isolation transformer gives roughly 170 VDC, which PWM servo drives accept. Drives in parallel share one bus voltage; their continuous currents add.

On this page
  1. What the nameplate gives you and what it withholds
  2. Where the bus voltage comes from
  3. Two transformer branches, worked out
  4. Voltage is shared, current adds
  5. Sizing the transformer kVA
  6. Matching the drive to the bus and to the stop
  7. The tachometer on the back
  8. The decision
  9. Questions asked

Size the supply from the nameplate's rated armature voltage and continuous current, never from the pulse amps or a software speed limit. On the example nameplate used throughout this article, that rated voltage is 142 V, and a single-phase full-wave rectifier with a capacitor-input filter charges the bus toward the AC peak, roughly RMS times 1.414, so a 1:1 120 VAC isolation transformer gives about 170 VDC. PWM servo drives accept that with margin. Three axes wired across the same bus all see that voltage; their continuous currents add. The sections below put every nameplate number where it belongs in the calculation, and show where it does not.

What the nameplate gives you and what it withholds #

Take the example nameplate of a permanent-magnet DC servo motor and read each field for what it actually decides:

  • Rated voltage, 142 V — the armature voltage at rated operation, which sets the target DC bus under load. It is not an AC transformer secondary rating.
  • Pulse current, 30 A — a short-duration motor and drive limit. It says nothing about the continuous supply rating.
  • Continuous stall torque, 3 N·m — a torque point. It hides the current until you know the torque constant.
  • Maximum speed, 2400 rpm — the commanded ceiling. A software speed limit is an operating control, not motor thermal protection.
  • Tach constant, 9.5 V/1000 rpm — analog velocity feedback, a different device from an encoder.
  • TENV enclosure and class F insulation — heat leaves mainly through the frame, so mounting and ambient conditions shape the thermal margin.

The number the nameplate withholds is the continuous armature current. Do not derive it from the pulse rating. Read it from the full motor datasheet, or compute it from the torque constant; for a constant in newton-meters per ampere, dividing the continuous torque the load needs by it gives the amperes, which is the same arithmetic used to calculate servo motor current from required torque.

Where the bus voltage comes from #

For a single-phase transformer feeding a full-wave bridge into a large filter capacitor, the first approximation is:

VDC = VAC(rms) x 1.414 - (2 x Vd)

where Vd is the forward drop of one diode, about 1 V, and two conduct at any instant, so the correction is around 2 V. Everything else moves the real value in both directions: transformer regulation under load, incoming-line variation, ripple across the capacitor bank, and the rise that comes when a decelerating motor returns energy to the bus.

Two transformer branches, worked out #

Branch 1, the exact match. Solve backwards from the nameplate: 142 V divided by 1.414 gives a secondary of about 100.4 VAC. Check the arithmetic the other way: 100 x 1.414 = 141.4 VDC, minus roughly 2 V of diode drop, landing at the rated armature voltage. It is the correct and elegant answer, and 100 VAC transformers are special-order parts on most continents.

Branch 2, the practical one. A 1:1 120 VAC isolation transformer, a bridge, and a capacitor bank: 120 x 1.414 = 169.7 VDC, call it about 170 VDC. This is the branch to take, and the reason it works is the drive topology, not a property of the motor. A PWM drive switches the bus at high frequency, so the armature sees an average voltage set by the duty cycle and torque follows current; the surplus above rated voltage becomes headroom for the bus rise during deceleration. Choose drives whose documented bus range covers it.

The error in the other direction is the expensive one. A bus far below rated voltage starves the motor of speed and torque before anything else fails, which is exactly what happens when a 13 VDC supply feeds a 120 VDC motor: this worked comparison of an under-voltage bus on a 120 VDC motor shows the machine getting a small fraction of rating. Undervolting hides; overvolting with a PWM drive is routine.

Voltage is shared, current adds #

Connect the drives in parallel across the common bus. Each drive sees the same voltage. The currents do not share: each axis draws what its load demands, and the instantaneous and average currents add at the supply. If the continuous armature current for one axis works out to 6 to 7 A, three simultaneously working axes demand 18 to 21 A continuous from the bus, with 3 x 7 A = 21 A as the top end. Confirm the 6 to 7 A figure against the actual duty cycle before it becomes a design input.

The simultaneous pulse figure, 3 x 30 A = 90 A, is a capacitor-and-drive number, not a transformer size. The bus capacitors deliver the short crest currents; the transformer carries the longer-term energy demand. Buying a 90 A transformer to cover pulses wastes money and can still run hot.

Sizing the transformer kVA #

Work from the secondary rating and derate for the rectifier load. For a single-phase secondary marked 120 VAC and 20 A, the nameplate apparent power is:

kVA = V x I / 1000 = 120 x 20 / 1000 = 2.4 kVA

A 20 A AC secondary is not a 20 A continuous DC output rating. A capacitor-input rectifier draws current in narrow peaks near the waveform crest, so winding heating runs ahead of what the DC output amperes suggest. Apply the transformer or rectifier manufacturer's derating data for capacitor-input service, and where the load data is thin, IEEE C57.110 is the standard that quantifies derating a transformer for non-sinusoidal load current: it accumulates the harmonic-related winding eddy losses into an equivalent continuous rating. Verify the result in service with a loaded bus-voltage reading and a winding-temperature check under the heaviest simultaneous acceleration.

Matching the drive to the bus and to the stop #

Take a drive rated 200 V and 40 A as an example. Against a nominal 170 VDC bus the arithmetic margin is 30 V, and that margin is only usable if the drive documentation states whether 200 V is an absolute maximum, a continuous operating limit, or something else. The number that decides the drive is not the nominal bus but the peak: measure the bus during the fastest commanded stop from top speed, when all three motors are regenerating, and compare that measured peak against the applicable limit from the drive documentation. If regeneration lifts the bus past what the drive tolerates, the drive documentation specifies the braking resistor or clamp that bleeds the excess. The same voltage, current and regeneration checks drive a replacement decision on old DC servo drives when the original amplifier is gone.

One safety note belongs here: a capacitor bank charged to this bus voltage stores a lethal charge that persists after power-off. Discharge through the documented bleeder path, verify zero volts with a meter, and lock out before working inside the supply.

The tachometer on the back #

The tach constant gives a useful independent speed check: at the nameplate maximum speed the expected signal magnitude is 9.5 x (2400 / 1000) = 22.8 V. That is a derived nominal value; measure the actual output and polarity with the shaft turning. A torque-mode PWM drive closes its loop on armature current and needs an encoder, not a tach, so the tach stays unconnected. Never wire a tach into an encoder input; the two devices produce different signals and belong to different drive architectures. On motors of this family the tach is built in and not worth removing, and the encoder usually sits under the rear cover on the shaft extension.

The decision #

  • Bus voltage: use a 1:1 120 VAC isolation transformer, bridge and capacitor bank for roughly 170 VDC, and select PWM drives whose documented bus range covers it including the deceleration peak. If you want the exact nameplate number instead, a 100 VAC secondary gives 141 VDC.
  • Transformer amperes: size from three times the continuous armature current, 18 to 21 A in this example, then apply capacitor-input derating. Never size from the pulse figure, single or tripled.
  • Drive rating: continuous and pulse current per axis within the drive's documented limits, bus range above the measured regen peak, braking resistor or clamp as the documentation calls for.
  • Feedback: an encoder into the drive; the tach left unconnected.

That is the whole supply: one transformer, one bridge, one capacitor bank, three drives in parallel, and the nameplate numbers each used exactly once, in the place where they decide something.

Questions asked

Why is a bus above the motor's rated voltage acceptable?

A PWM servo drive chops the bus into voltage pulses, so the motor sees an average set by the duty cycle and torque follows current. The extra headroom also absorbs the bus rise that happens when a decelerating motor pumps energy back into the capacitors. The commanded speed limit keeps the armature at or below its rated speed, and the drive current limit plus the duty cycle protect it thermally.

Do three motors on one supply each need the full voltage and current?

The voltage is shared: drives wired in parallel all see the same bus voltage, so one supply sized for the bus serves all three. The current is not shared. Each axis draws what its load demands, and the instantaneous and average currents add at the supply, so the continuous figure for three axes is three times the continuous armature current of one, confirmed against the actual duty cycle.

Should the transformer be sized for the 30 A pulse rating?

No. The pulse rating is a short-duration motor and drive limit, not a supply rating. During acceleration the bus capacitors deliver the crest currents while the transformer carries the longer-term energy demand. Size the transformer from the sum of the axes' continuous armature currents, then apply the manufacturer's derating for a capacitor-input rectifier, because the charging current arrives in narrow peaks near the AC crest and heats the windings more than the DC output amps suggest.

What happens to the tachometer when I use a modern drive?

Leave it unconnected. A torque-mode PWM drive closes its loop on armature current, so it needs an encoder for position, not a tach for velocity. The tach and an encoder produce different signals and belong to different drive architectures, so never wire the tach into an encoder input. On motors of this type the tach is built in and hard to remove, and there is no need to; the encoder usually sits under the rear cover on the shaft extension.

Keep reading

  • Selection guide

    What Decides a Drive for a Resolver-Feedback AC Servo Motor

    A resolver-feedback AC servo motor needs a drive that reads resolver feedback or runs on a retrofitted encoder with hall commutation, accepts step and direction in position mode, and covers the motor's continuous and peak current at its voltage class. A lower supply class keeps the torque and caps top speed; work the checks in order and the decision follows.

    Motors, gearboxes and drives sizing

  • How-to

    How to Calculate Servo Motor Current From Required Torque

    Current follows commanded torque: divide required torque by the winding's torque constant, I = T/Kt. The continuous-current rating is a thermal limit, not a fixed draw. For the worked example of 3.02 N·m at 2160 rpm (683 W shaft), check the point on the 48 V torque-speed curve and size the supply from the drive's input-current spec.

    Motors, gearboxes and drives sizing

  • Selection guide

    Servo Motor Voltage Selection: AC or DC for Your Axis

    No formula turns oz-in torque or a payload mass into a supply voltage. Size the motor-gearbox pair from continuous and peak duty, select a documented motor-drive pair that covers it, and supply exactly the AC or DC input range its datasheet names. For a fixed arm on building power that lands in the single-phase 200-240 V AC class; three-phase above roughly 1.5 kW.

    Motors, gearboxes and drives sizing